In summer 2011, the company will deliver a new generation Smartlock computerized control unit (PAI-NG), the second such delivery under the framework contract signed by the two companies in 2006.
Read More →The $43.1 million contract, plus options and alternatives, includes the design and supply of equipment for the train control upgrade of the existing Yonge University Spadina Subway Line.
Read More →Trams feature a low floor to provide easy access for persons with reduced mobility, air conditioning, video surveillance, visual information displays and spoken announcements.
Read More →Presentation of the first train is scheduled for December 2010.
Read More →Alstom Transport will support the modernization of the manufacturing sites of Transmashholding and the development of a new generation of rolling stock adapted to the Russian market.
Read More →Features include computer-monitored throttles and speedometers for better control and smoother ride and an onboard, computerized diagnostic system that allows quicker repair when a failure does occur.
Read More →
Total contract value approximately $176 million, with shares of around 50 percent for each partner.
Read More →
Test runs are to be performed on a 106-mile section of France's Eastern high-speed line between the Champagne-Ardenne and Lorraine stations.
Read More →With this order, the MTA is taking up the second option on a contract originally awarded to Alstom and Kawasaki in 2002. Alstom’s share of the latest order represents approximately $491 million and covers the production of 242 metro cars.
Read More →Pierre L. Gauthier has been appointed president and CEO of Alstom U.S. and will be based in the new Washington headquarters, along with a senior executive team.
Read More →