Alstom to supply automatic train control to Santiago, Chile
The Urbalis solution will significantly increase train frequency and transport capacity while ensuring optimal safety, flexible operations and heightened passenger comfort, according to Alstom.
The Chilean operator Metro de Santiago awarded Alstom Transport a contract to supply automatic train control system for Santiago metro's line 1. This contract, worth approximately $70 million, concerns the renovation of the existing train control system, including design, manufacturing, installation, putting into service of the Urbalis solution and its maintenance for three years.
The Urbalis solution will significantly increase train frequency and transport capacity while ensuring optimal safety, flexible operations and heightened passenger comfort, according to Alstom.
The new system will also permit Metro de Santiago to reduce intervals between trains on line 1, allowing an increase of passengers per hour by 20 percent on the line that at present carries approximately one million passengers per day.
Implementation of the system on the line will be with no service interruptions and is scheduled to begin in September 2010.
More Rail

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →
The Business Voice Behind Public Transportation
As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.
Read More →
FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability
The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.
Read More →
OKC Streetcar Makes Zero-Fare Service Permanent
Ridership increased an average of 71% compared with the same period a year earlier during the fare-free pilot.
Read More →
DART Customer Satisfaction Reaches Six-Year High
Overall satisfaction rose to 74.9%, while the agency’s Net Promoter Score reached a record 33.7.
Read More →