Loading data...
This purchase is a follow-on order from the initial $898,400 contract announced in August 2009. At that time, Proterra purchased battery modules for several zero-emission demonstration buses, one of which was displayed to Washington, D.C. policymakers in October 2009.
Read More →Participants will get a first hand look at the timeline for fuel-cell buses and their projections for price reductions and full commercialization, a look at some new exciting battery electric bus technology being field tested, and hear about some truly new and very cost effective options to enhance the use of natural gas and natural gas refueling and electric recharging.
Read More →The DesignLine buses, which have a capacity of either 35 or 37 seats, depending on the configuration, with 30 standees, are anticipated to have significantly reduced maintenance costs, and include a 12-year warranty on the turbine engine and lithium-ion battery pack, eliminating the need for midlife replacement.
Read More →Advanced battery technology comprises the use of lightweight, non-corroding and non-sulfating microcell foam plates to replace the heavy non-conductive lead metal plates typical of traditional lead acid batteries.
Read More →