Loading data...
Completed implementation on all Sounder commuter rail vehicles that run between Lakewood and Everett.
Read More →The project at the South Terminus of the MAX Green and Yellow lines will produce approximately 65,000 kilowatt hours of energy annually, offsetting energy used by site lighting and two light rail electrical system buildings. The excess energy produced will add clean energy to the Portland General Electric grid.
Read More →The proposal was submitted by Kiewit Infrastructure Co., which led the design-build construction team on the Transportation Expansion project – a joint highway/light rail project of RTD and the Colorado Department of Transportation. Kiewit is also currently constructing the transit improvements at Denver Union Station.
Read More →With more than 25 years of professional experience, Richard Amodei has been responsible for the pursuit and performance of several major projects, including the Delaware River Port Authority's $1.5 billion Glassboro-to-Camden light rail line.
Read More →Energy efficient substations will supply power along light rail alignments.
Read More →Work will involve drilling large steel anchors more than 100 feet long into the bedrock of the slope adjacent to the railroad track to prevent it from pushing the track further toward the ocean.
Read More →The overall project is expected to generate 60,000 direct and indirect jobs.
Read More →Six-mile line links East L.A. with downtown Los Angeles and Pasadena, as well as with the Metro Blue and Green light-rail lines, Metro Red and Purple subway lines and the Metro Orange Line dedicated busway.
Read More →The air-conditioned, low-floor vehicles, manufactured by Bombardier Transportation, are nearly twice the length of the old Canadian Light Rail Vehicles and can accommodate 250 people.
Read More →Requirements include establishing an SSO agency that is financially and legally independent from the rail transit agencies it oversees.
Read More →