STV, in a joint venture, provided program management, design and construction management for Phase I of the light rail project — a 25-mile, 13-station light rail build-out of the DART system that was completed in 2003.
Read More →
The GoldLinQ consortium, of which the supplier is a member, will design, build, finance, operate and maintain the first stage of the Gold Coast Rapid Transit light rail public transportation system for the Queensland Government. Bombardier’s share of the contract is valued at approximately $265 million.
Read More →David Heath was hired as SMART's chief financial officer a year ago, but took over as interim GM following the abrupt resignation of Lillian Hames in January.
Read More →ConnectLAX will provide environmental and preliminary design services for an extension of the Metro Green Line light rail to Los Angeles International Airport.
Read More →The report, "Ottawa's Light Rail Transit Project Schedule Acceleration and Procurement Option Selection," also suggested the project use a design-build-maintain model.
Read More →The purchase of the key property from the Port of Seattle supports Sound Transit's work to start construction of East Link in 2015. Included in the purchase package offered by the Port is an easement that provides access to 37 miles of the rail corridor between Woodinville and Renton for other potential high-capacity transit investments in the future.
Read More →Vehicle and equipment testing and crew qualifying are the first phase of operations in preparation for revenue service and began in April in the southern segment between Lewisville and Carrollton. System testing of the segment north of Lewisville Lake will begin in mid-May.
Read More →
Valley Metro's online music video campaign, "Valley Metro Notes," consists of 11 songs from six local bands, showing in an entertaining way how to use the transit system. The campaign is geared toward high school, college students and older, with the caveat of not alienating any other demographic.
Read More →
The 11-mile Central Corridor light rail line, which includes 18 new stations, 31 new rail cars and a new vehicle maintenance facility in St. Paul, is scheduled to open in 2014.
Read More →New light rail extension includes 1.1 miles of new track and two new stations. The project, which was originally scheduled to open this spring, is estimated to cost $44.4 million and serve about 3,200 daily round-trip passengers.
Read More →