Valley Metro to use solar power in cooling system
NRG Thermal LLC is building a system that uses solar power and the company’s downtown district cooling system to provide cooling to the seating areas of the popular 3rd Street/Washington Valley Metro light rail station. Will design and build the system by July 5, the week before the Major League Baseball All-Star game is held in Phoenix.
NRG Thermal LLC, a subsidiary of NRG Energy Inc., is building an innovative system that uses solar power and the company’s downtown district cooling system to provide cooling to the seating areas of the popular 3rd Street/Washington Valley Metro (Metro) light rail station. The system will launch this July and operate May through September annually, when summer temperatures often exceed 110 degrees.
“I was able to experience a similar system during a business trip to Dubai and brought the idea back to Phoenix,” said Phoenix Mayor Phil Gordon. “NRG took the ball and ran with it, investing its money and expertise to make this happen. This solar-powered system will make riding the light rail in Phoenix even cooler. It’s an example of public-private partnership at its best.”
“This partnership with NRG will have a direct and positive impact on our riders,” said Metro CEO Steve Banta. “In addition to being a welcomed customer amenity, this project is the first use of solar energy on our system. We’re hopeful it can lead to other solar opportunities along our current line and as we grow.”
NRG plans to design and build this project by July 5, the week before the Major League Baseball All-Star game is held in Phoenix. Throughout the project’s construction, access to light rail service and station amenities, including fare vending machines, will not be affected.
Project benefits include:
• Free and on-demand cooling for passengers will improve the rail system experience.
• The system is environmentally friendly, leveraging the existing energy-efficient downtown district cooling system and using solar power to operate the air-conditioning/air-moving system.
• NRG will cover the entire cost of building, operating and maintaining this new system, which means no additional costs to local residents and commuters.
• The project will include an educational exhibit showcasing the technology and how it works.
NRG owns and operates NRG Energy Center Phoenix, which provides cost-efficient and effective cooling for 34 major buildings in downtown Phoenix including Chase Field, US Airways Center, the Phoenix Convention Center, the Sheraton Hotel, Symphony Hall and CityScape, among others.
The company also owns and operates distributed solar systems in Arizona at several schools, which help reduce the schools’ utility bills and provide shade for on-campus parking lots.
More Bus

Biz Briefs: Montréal Debuts Nova Electric Buses and More
In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.
Read More →
The Hidden Cost of Fuel Data Inaccuracy in Public Transit Fleets
In today's transit environment, accurate fuel and mileage data are critical to reducing costs, minimizing downtime, and improving fleet performance.
Read More →
Virginia's $28.5B Transportation Plan Targets Transit and Rail
Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.
Read More →
Bipartisan BUSES Act Seeks Changes to New York City's Bus Idling Enforcement Program
Backed by motorcoach operators, the legislation seeks to balance emissions goals with passenger safety by allowing limited idling for inspections, accessibility needs and extreme weather conditions.
Read More →
D Line Expansion Fuels Growth Across LA Metro's Rail System
Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.
Read More →
ENC to Deliver Three Clean Diesel Buses to Canada's York Region Transit
Since 2005, City View and ENC have supplied nearly 90 E-Z Rider II buses to YRT.
Read More →
Frontrunner Bus Group Expands with New Massachusetts Headquarters
The significantly larger facility will provide the infrastructure needed to support the company’s growing workforce, advanced technologies, and expanding product line.
Read More →
Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility
In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.
Read More →
Reinventing Fleet Maintenance with Real-time Visibility and AI
Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.
Read More →
SamTrans Sets Priorities for Potential Connect Bay Area Revenue
The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.
Read More →