
This creation was a commitment made by the group at the time of the acquisition of Bombardier Transportation.
Read More →
With the German Aerospace Center and the TU Berlin, Alstom is developing technical solutions to gradually digitize rail passenger transport in Germany.
Read More →
The multibillion-dollar On-Corridor Works Project will transform collective mobility in the Greater Toronto and Hamilton Area, making it faster, more reliable, and more sustainable.
Read More →
The contract is valued at just over $2.17 million.
Read More →
Alstom is designing a hydrogen solution based on a high-power fuel cell system that can power electric locomotives on non-electrified sections.
Read More →
The 25 additional cars will include five multilevel cab cars, 17 multilevel trailer cars, and three multilevel trailer cars with restrooms.
Read More →
The new trains will run on Germany’s Main-Weser subnetwork operating between Frankfurt, Giessen, Marburg and Kassel and will support the planned timetable change on 15 December 2024.
Read More →
The services cover preventive and corrective maintenance as well as overhauls for a total fleet of 82 trains at contract signature.
Read More →
Alstom will continue to honor its obligations under the existing orders for Rolling Stock from Trenitalia and ILSA to ensure a seamless transition.
Read More →
The mid-life overhaul and upgrades of the cars will be performed over a two-year period, requiring the vehicles to be stripped down, overhauling parts, and producing newly refurbished BiLevel cars for the GO Transit fleet.
Read More →