
Stantec Consulting Services was also involved in the construction of the first 20 miles of the Valley Metro light rail construction that was completed in 2008, as well as the extensions into downtown Mesa and in northwest Phoenix.
Read More →
As the lead designer, HDR will oversee all aspects of building design, working closely with staff at LA Metro to create plans for the architecture, structures and communication systems.
Read More →
The contract outlines a $10 million budget to construct the streetcar line.The city wants the money to come from property owners near the streetcar line, but they rejected it in a vote last year.
Read More →
The $66 million project will include upgrading and expanding the 25-year-old Willowbrook/Rosa Parks Station, which currently connects the Blue Line between Long Beach and downtown Los Angeles with the Green Line, which runs from Norwalk to Redondo Beach.
Read More →
Beating out a field of more than 100 other teams from around the world, the group of MIT graduate students won the best overall design award for a vehicle, or pod, that will ride inside the Hyperloop, a system of tubes connecting major cities.
Read More →
Will be the lead designer for the Dragados-Flatiron Joint Venture for the design-build contract and is responsible for the infrastructure design. Officials estimate the construction value to be $1.2 billion.
Read More →
Together with consortium partners, the company was responsible for the delivery of a full turnkey light rail system, including the manufacture of more than 100 Bombardier Flexity light rail vehicles.
Read More →The team will manage the $13.8 million design services contract, which includes engineering, architectural design services and construction management.
Read More →The station is part of the city's Eglinton-Scarborough Crosstown Light Rail Transit system, a project that will connect riders from Black Creek Drive to Scarborough City Center.
Read More →Will implement the FasTracks program with existing revenues as part of the Denver Regional Council of Government’s Regional Transportation Plan. Also looking to optimize ways to complete more of FasTracks sooner by re-evaluating elements of the program and all available resources.
Read More →