Loading data...
The NABI BRT has been engineered and "Whole Bus Tested" at the Altoona Bus Testing Center as a heavy-heavy-duty transit bus and is equipped with a proven structure and industry standard components for dedicated BRT operation as well as regular fixed-route service.
Read More →In addition to the SunRunner name and logo, officials also revealed that some station designs will incorporate public art by local artist Catherine Woods.
Read More →Following an extensive third-party evaluation in 2024, RTD moved toward restructuring the program to ensure its fiscal sustainability.
Read More →In April, the board of directors approved the $150 million project, which runs from the San Leandro Bay Area Rapid Transit District through downtown Oakland.
Read More →Albany’s CDTA BusPlus ridership represents 10% of the more than 15.5 million trips taken on the system during the 2013 fiscal year, and the total boardings represent its highest ridership in more than 20 years.
Read More →Fifty-four percent plan to use hybrid-electric propulsion for their vehicles, while 36% plan on using CNG. One-third plan on tapping clean diesel for their fleet and only one operator plans to use trolleys.
Read More →New York City Transit is joining the NYC Department of Transportation (DOT) to provide Select Bus Service (SBS) - a new type of rapid bus operation employing advance fare payment, dedicated travel lanes and traffic signal priority.
Read More →FTA Administrator Peter Rogoff signed the full-funding grant agreement during a ceremony at Central Connecticut State University in New Britain. The grant clears the way for the Connecticut DOT to begin construction of the bus rapid transit system and covers about half the total cost of the $567 million project.
Read More →With construction expected to begin in 2014, the system could be fully operational by 2016.
Read More →