Loading data...
The RLE project is a 5.6-mile extension of the Red Line starting at 95th Street Terminal to the vicinity of 130th Street and includes building four new, accessible stations near 103rd Street, 111th Street, Michigan Avenue, and 130th Street.
Read More →The show got started with President/CEO Paul Skoutelas touting transit's successes and resiliency.
Read More →Made possible by grant funding from the CRISI program, this pioneering technology creates a better experience for drivers and pedestrians while increasing safety for Metrolink passengers.
Read More →The contractor named a new CEO and promoted its previous CEO.
Read More →The addition will offer passengers a seamless one-seat ride to and from Downtown Miami, significantly reducing travel time between the West Palm Beach and MiamiCentral stations.
Read More →The 1,000-mile testing process is the final step of testing required to ensure all safety and quality standards are met before the train can operate on SacRT’s tracks when service of the new low-floor trains begins later this summer.
Read More →Over the past two years, the Iowa operator purchased six 45-foot J4500 and two 35-foot J3500 coaches with custom interiors and luxurious passenger amenities.
Read More →He will succeed Richard Davey, who served as president of New York City Transit from May 2022 until announcing his departure this week.
Read More →The Mark V design features consist of five-car sets, all internally open-ended with walk-through carriages. They have mostly forward-facing seating and include more space for bikes, luggage, and leaning pads.
Read More →The investment, created by the Bipartisan Infrastructure Law, has been awarded through the All Stations Accessibility Program.
Read More →