Once in service the vehicles will account for 18% of AC Transit's 60-foot articulated fleet. Production of the buses is anticipated to begin in March 2013 , with delivery expected by August 2013.
Read More →In April, the board of directors approved the $150 million project, which runs from the San Leandro Bay Area Rapid Transit District through downtown Oakland.
Read More →The incident occurred at approximately 2:15 a.m. when a blaze in a building under construction near the West Oakland Station damaged electrical and communications systems on the elevated BART tracks and forced the transit agency to cancel Transbay service just hours before the start of the morning commute.
Read More →With construction expected to begin in 2014, the system could be fully operational by 2016.
Read More →Newest on-site energy station, which was engineered by Linde North America, Jacobs and EPC and built by W.L. Butler Construction, demonstrates the use of “renewable” hydrogen — hydrogen produced using Proton OnSite’s solar-powered electrolyzer.
Read More →In total, the 40-foot long, diesel-fueled buses will cost $16.4 million-with $8.2 million in agency funds being matched by $8.2 million from the State Local Partnership Program.
Read More →Police documented 95 sex crimes on BART, San Francisco MUNI and Alameda County Transit in 2011. However, experts who study sex crimes on public transit say the numbers are significantly underreported.
Read More →David J. Armijo will replace retiring Mary King, who led the transit district since October 2009.
Read More →Arul Edwin, who has successfully managed similar transportation projects from Boston to Seattle, is now the program director for a BRT plan that will modernize and improve East Bay bus service.
Read More →The original contract, valued at $100,000, began in 2010 and was set to expire in April 2011. The contract has been extended through the end of 2011 with nearly $200,000 in additional contract budget awarded.
Read More →