Outstanding safety recommendations included, enhance the safety redundancy of [Metro’s] train control system by evaluating track occupancy data on a real-time basis and Implementing cable insulation resistance testing as part of Metrorail’s periodic maintenance program.
Read More →The aggressive capital program, known as Metro Forward, includes projects to replace 95 buses; rehabilitate 100 buses, 42 escalators and 21 elevators; install event recorders on the 1000- and 4000-series railcars, and continue the rehabilitation of track and structures maintenance on the Red, Orange and Blue lines.
Read More →An arbitration panel ruled that Metro could continue to screen employees for sleep disorders, but needed to provide temporary provisional cards so workers could work while waiting for a sleep study.
Read More →The order for 95 Xcelsior XDE40 buses is a conversion of options under the existing contract with the transit system and follows upon the delivery of 152 Xcelsior buses during 2011.
Read More →
The agency’s most recent bicycle parking census shows that bike parking usage in 2012 is up 3% from last year and the availability of bicycle parking near Metrorail stations has increased to more than 4,000 spaces.
Read More →The specialized railcar, custom-built by Ensco, is equipped with advanced technology that analyzes the condition of rail and track infrastructure and alerts Metro to potential defects.
Read More →The issue represents two competing demands tugging at Metro: fulfilling a pledge to improve safety while also keeping up with service demands.
Read More →Will design and construct a test track, commissioning facility, parking garage and other facilities near the existing Greenbelt Maintenance Yard in Prince George’s County, Md. The new facility will allow Metro to conduct testing and commission new and rehabilitated rail vehicles.
Read More →
MetroAccess customers will benefit from shorter boarding times as a result of the MV-1 ramp design, which allows customers to board without the use of a lift. The vehicles cost about $50,000 each.
Read More →Will introduce new limited-stop MetroExtra routes on three new travel corridors, conversion of four existing routes to limited-stop MetroExtra service, and refinements to eleven existing priority corridors.
Read More →