Installation of an advanced signal system is a component of the $1.5 billion Caltrain Modernization Program and includes Positive Train Control technology.
Read More →John Fenton stepped in after the 2008 Chatsworth crash that killed 25 people and he pushed forward a $200 million project to prevent collisions through positive train control technology.
Read More →Railroads will no longer have to conduct risk analyses to obtain approval to not install PTC or take other costly risk mitigation measures on an estimated 10,000 miles of track that will not carry passenger trains or poison inhalation hazard commodities after December 2015.
Read More →Both operators of a coal train that struck the back of another Burlington Northern train that was stopped near Red Oak, Iowa, last April, fell asleep and missed signals to slow and stop.
Read More →By mid-year, the new system will allow passengers to sign up for text messages and e-mail notifications with train status updates. The system will also be integrated with current social media sites, displaying the same information on the agency's Facebook and Twitter pages.
Read More →The $200 million system is on an accelerated pace per a $20.9 million grant from the California DOT.
Read More →Expects by the end of 2012 to more than triple the number of track-miles on its own railroad where PTC safety technology is installed as part of a program begun more than two years ago.
Read More →Awarded a contract to Ansaldo STS USA Inc. Agency officials said that the cost would mean canceling or delaying many other transit projects in the Philadelphia region.
Read More →
Designed to help customers run their rail operations more efficiently, the sector is organized into five divisions: Building Technologies, Low and Medium Voltage (power distribution for utilities and facilities), Mobility and Logistics (traffic, transport and logistics management), Rail Systems (rail vehicles) and Smart Grid (intelligent power grids).
Read More →Proposed amendments would eliminate the need to perform analyses on forgoing PTC installation and rerouting shipments of some hazardous materials off a rail line. Lines used to provide passenger service would still require PTC. Affected railroads are expected to realize an estimated cost savings of $340 million in the first several years
Read More →