METRO Magazine Logo
MenuMENU
SearchSEARCH

L.A.'s proposal: a model for U.S. projects?

Mayor Antonio Villaraigosa, shown at a press event at the Los Angeles City Hall, wants the federal government to loan directly, or guarantee private sector loans, to the county's Metropolitan Transportation Authority to the tune of $8.8 billion.

by Cliff Henke
April 13, 2010
L.A.'s proposal: a model for U.S. projects?

Photo By: Tyrone D. Washington/ LA Mayor’s Office

3 min to read


[IMAGE]Rails-1.jpg[/IMAGE]A delegation from Los Angeles has recently taken several trips to Washington, D.C., meeting with administration and ­congressional officials to float an idea they have to speed up projects that use local funds. If adopted, their proposal could have ­implications for all major transit infrastructure projects throughout the country.

Leveraging local tax dollars

Ad Loading...

Simply put, Mayor Antonio Villaraigosa wants the federal government to loan directly, or guarantee private sector loans, to the county's Metropolitan Transportation Authority to the tune of $8.8 billion. That amount represents the gap between completing the massive expansion plan passed by voters through Measure R in November 2008 in a decade rather than 30 years. That's why he and county officials call it the "30-10 plan." Measure R funds a 78-mile expansion of the county's rail and bus rapid transit network with a dedicated sales tax increase.

The proposal is not asking for a handout. Rather, it is asking for the full faith and credit of the federal government on loans that would be repaid with sales tax revenues that are already designated to the project.

Both chairs of the Transit and Highways subcommittee and full Transportation and Infrastructure Committee in the House as well as their counterparts in the Senate are investigating whether and how either the Build America Bonds program, the proposed National Infrastructure Bank or some other policy can accommodate this concept. 

As are Seattle's officials, because the voters of their region have also enacted a local tax increase to support transit expansion. In fact, more than $70 billion in local, state and county taxes over the past decade have been approved for transit projects. More than 70 percent of all referenda for transit have been approved in local elections since 2000, according to the Center for Transportation Excellence in Washington, D.C., which tracks such initiatives throughout the country. 

What's not to like?

Ad Loading...

Of course, not everyone is enamored by the idea. Some libertarian groups oppose virtually any federal funding of rail transit on ideological grounds, and other conservative groups are against any federal leveraging of infrastructure investment. Never mind that the federal government has never defaulted on such a loan and, in virtually all cases, receives a return on any investment, just as it has done in the Troubled Asset Relief Program. Furthermore, as mentioned earlier, this likely will be only a federal guarantee that doesn't even hit the Treasury's books.

Some more legitimate hurdles need to be overcome as well, such as the fact that there is nothing in current law enabling such an idea. However, at a time when both sides of the political spectrum are looking for ways to stimulate the economy, create construction and other jobs, and help state and regional economies in low-cost, low risk ways, this seems like a no-brainer.

Cliff Henke, a contributing editor to METRO, is senior analyst at PB. His views herein are solely his own.

 

 

Subscribe to Our Newsletter

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →