METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom signs 2-year extension with SFMTA for inventory control

The fleet is composed of 151 light rail vehicles, 26 historic streetcars and 40 cable cars, and require a continuous supply of spare parts and inventory from a variety of vendors.

February 2, 2017
Alstom signs 2-year extension with SFMTA for inventory control

SFMTA streetcar

Photo: Alstom

2 min to read


SFMTA streetcar

Photo: Alstom

Alstom and the San Francisco Municipal Transportation Agency (SFMTA) have signed a two-year extension contract for an inventory control program, called Vendor Managed Inventory (VMI), which enables SFMTA to improve fleet availability. The contract extension is worth approximately $15.6 million.

SFMTA’s fleet is composed of 151 light rail vehicles, 26 historic streetcars and 40 cable cars, and require a continuous supply of spare parts and inventory from a variety of vendors. Many parts become obsolete or difficult to locate as the fleet ages. Alstom’s VMI program identifies the most-critical and the most-used parts, manages the purchase of trains parts as well as the control and flow of the inventory, and provides reverse engineering for parts that are unavailable or obsolete.

The VMI program, which is part of Alstom’s services portfolio, reduces the processing and delivery time for restocking inventory through automated parts replacement and improved forecasting. Greater parts availability means preventive and scheduled maintenance can be performed on-time and vehicles can be returned to service more quickly. Alstom’s VMI service has resulted in nearly 10% more cars available for revenue service each day and a 74% increase in the mean distance cars travel before requiring repair.

A key differentiator is Alstom’s ability to apply its VMI program to assist in the servicing of other manufacturers’ vehicles.  Alstom’s international sourcing team is capable of locating vendors around the world.

Ad Loading...

Alstom has a proven global history of using VMI to help its customers more efficiently manage the flow and inventory of parts, including providing its VMI services to Amtrak to help it maintain and repair its current Acela fleet. The Alstom VMI service provided to SFMTA is managed out of Alstom’s Mare Island facility, north of San Francisco.

In addition to the VMI service for SFMTA, the Alstom team at Mare Island performs extensive wreck damage repairs on the Amtrak Pacific Surfliner fleet and is making modifications to 66 Caltrans bi-level intercity passenger rail coaches. Alstom is also currently overhauling and rebuilding traditional passenger cars into more luxurious coaches for Rocky Mountaineer.

Alstom has been a service provider for more than 25 years and has been awarded over 100 maintenance projects and more than 80 modernisation contracts around the world.

More Rail

A wide shot of Alstom's Multilevel III commter railcar for NJ TRANSIT
Rail•by Alex Roman•November 13, 2026

NJ TRANSIT Approves $65.6M for Hudson-Bergen Light Rail Improvements

The funding marks the first phase of a planned $250 million investment over five years to modernize stations, overhaul vehicles, and improve system reliability and passenger safety.

Read More →
STraffic's John Moon
Technology•by Alex Roman•November 12, 2026

STraffic Expands North American Presence with Fare Collection Technology

John Moon, Associate Director, Product Strategy at STraffic, discusses the company's growth in North America, its efforts to reduce fare evasion, and more.

Read More →
An aerial shot of the Denver region
Management•by Alex Roman•November 12, 2026

Study: Denver RTD Generates $2.1 Billion in Annual Economic Activity

An economic impact study finds the agency supports approximately 17,500 jobs, delivers $1.6 billion in annual community and mobility benefits, and generates $2.42 in economic value for every dollar invested.

Read More →
Ad Loading...
METRO Magazine leadership update graphic featuring a portrait of Mark Aesch, identified as administrator of the Federal Transit Administration (FTA), alongside the U.S. Department of Transportation and FTA logos on a blue gradient background.
Management•by Alex Roman•November 12, 2026

Mark Aesch Nominated to Lead Federal Transit Administration

The former Rochester transit chief and TransPro founder, who has also contributed to METRO Magazine, brings decades of industry experience and a focus on performance, accountability, and financial sustainability to the nomination.

Read More →
Transit Reaches 200 Agency Partnerships, Expands Rider Experience Tools
Technology•by Alex Roman•November 6, 2026

Transit Expands Agency Partnerships, Reaching 200 Official App Partners

COO Jake Sion discusses Transit’s growth, the success of its Transit Royale program, and how technology is helping agencies improve the rider experience.

Read More →
A rendering of Trinity Metro's future station at the Medical Center
Rail•by Alex Roman•October 30, 2026

Trinity Metro Breaks Ground on $270M TEXRail Extension

The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.

Read More →
Ad Loading...
Austin Light Rail rendering from UT perspective
Rail•by Alex Roman•October 30, 2026

Bringing Austin’s First Light Rail System to Life

Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.

Read More →
Two Metra locomotives on rail tracks.
Rail•by Alex Roman•October 29, 2026

Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail

The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.

Read More →
METRO Magazine graphic featuring railroad tracks and switches inside a dark tunnel with the headline “Amtrak Completes First Street Tunnel Upgrades, Restores Service.”
Rail•by Elora Haynes•October 29, 2026

Amtrak Completes First Street Tunnel Upgrades, Restores Service

The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.

Read More →
Ad Loading...
FRA Invests $2.3B in Rail Projects Nationwide
Rail•by Alex Roman•October 28, 2026

FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide

The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.

Read More →