METRO Magazine Logo
MenuMENU
SearchSEARCH

Amtrak Ill. high-speed corridor work continues

Illinois DOT and Union Pacific are performing another phase of upgrades to Illinois’ signature high-speed route, Chicago-St. Louis, for future 110 mph operation of Amtrak Lincoln Service trains.

July 24, 2013
Amtrak Ill. high-speed corridor work continues

Photo courtesy vxla

2 min to read


Photo courtesy vxla

The Illinois Department of Transportation and Union Pacific Railroad are performing another phase of upgrades to Illinois’ signature high-speed route, Chicago-St. Louis, for future 110 mph operation of Amtrak Lincoln Service trains.

The construction work includes the installation of new premium rail with concrete ties and stone ballast; upgrades to bridges, culverts and drainage; signal and wayside equipment installations and upgrades; and roadway-rail grade crossing improvements.

Ad Loading...

For eight days starting August 16, bridge and culvert upgrades north of Bloomington-Normal will lead Amtrak to charter buses for Lincoln Service (Trains 300-307) passengers at St. Louis, Alton, Carlinville, Springfield, Lincoln, Normal, Pontiac, Dwight, Joliet and Summit, Ill.

Amtrak Texas Eagle (Trains 21/321/421 & 22/322/422) will detour between Chicago and St. Louis for the same period, with alternate transportation in both directions between Joliet and St. Louis. Two more phases of planned 2013 construction will also require substitute transportation.

To expedite travel between Chicago and downstate, many of the buses will connect to and from Amtrak Illini and Saluki trains in Champaign-Urbana to avoid Chicago suburban highway congestion and downtown Chicago traffic.

These infrastructure improvements will allow Union Pacific crews to enable Amtrak to operate service at speeds up to 110 mph, an increase from the current maximum of 79 mph in effect over most of the route. Starting last Thanksgiving, the Dwight to Pontiac segment became the first part of the corridor to regularly experience trains traveling at speeds up to 110mph.

In the nine months since October 2012 (Amtrak Fiscal Year 2013), ridership on the Chicago-St. Louis corridor has increased by nearly 23,000 when compared with the same period a year ago, totaling more than 551,000 passengers — an increase of 4% that sets the stage for another record breaking year, according to Amtrak.

 

Topics:AmtrakRail

More Rail

STV's Garo Hovnanian
Managementby Alex RomanMay 13, 2026

The Expanding Role of Advisory in Transit Delivery

Garo Hovnanian explores how agencies can better navigate competing priorities, strengthen decision-making, and prepare for a future shaped by electrification and emerging mobility.

Read More →
An image of empty railroad tracks in Minnesota with white text reading "Federal Railroad Administration Finalizes Rail Rules Aimed at Efficiency and Safety."
Railby Staff and News ReportsMay 13, 2026

Federal Railroad Administration Finalizes Rail Rules Aimed at Efficiency and Safety

See what deregulatory rail rules were finalized to reduce outdated requirements, support innovation, and streamline rail operations without compromising safety.

Read More →
An NJ TRANSIT bus.
Managementby StaffMay 13, 2026

NJ TRANSIT to Expand Cleanliness, Safety, and Accessibility Under New Action Plan

The plan includes investments in cleaner vehicles and upgraded stations, NJT LiveView to provide real-time GPS tracking of train and light rail service, enhanced safety initiatives through a new Real Time Crime Center, and the debut of a redesigned NJ TRANSIT mobile app.

Read More →
Ad Loading...
METRO Biz Briefs cover photo

STV Launches Power Practice and More in Biz Briefs

In METRO's latest installment, we take a look at the latest news from SilverRide, Complete Coach Works, and more.

Read More →
Local, Federal, State, and LA Metro officials at the opening of the D Line.
Railby StaffMay 10, 2026

LA Metro Opens D Line Extension

The only new subway opening in the US this year, the D Line Extension represents one of Metro’s top transit priorities and a historic milestone for Los Angeles, with Sections 2 and 3 set to open in 2027.

Read More →
Governor Moore in a ceremony placing the last track
Railby StaffMay 8, 2026

Maryland Governor Installs Final Purple Line Rail During Tour

The moment marks the completion of 193,100 feet of track linking Prince George’s and Montgomery counties.

Read More →
Ad Loading...
PATCO's New Control Center
Managementby StaffMay 7, 2026

PATCO Opens New Operations Control Center

The new center serves as the central hub for monitoring and managing PATCO train operations, communications, customer service coordination, incident response, and overall operational oversight across the transit system.

Read More →
VIA Rail Canada logo
Railby StaffMay 7, 2026

VIA Rail reports Stable Ridership, Rising Revenue Amid Ongoing Challenges

Despite these pressures, VIA Rail is reporting that total revenues increased to $514.8 million as more travelers took advantage of the wide range of options available through the corporation’s new reservation system.

Read More →
SEPTA's advertisement for multi-rider feature.
Technologyby StaffMay 7, 2026

Philadelphia's SEPTA Introduces Multi-Rider Feature for Contactless Payments

Up until now, this feature was only available when using a SEPTA Key card.

Read More →
Ad Loading...
A Waev Gem vehicle with a ramp deployed.

ABC Teams with Waev, Knorr-Bremse in Boston Top Biz Briefs

Stay informed with these quick takes on the projects and companies driving progress across the transportation landscape.

Read More →