CCW takes previously used, internal-combustion engine buses and remanufactures them into like-new vehicles containing ZEPS all-electric drivetrain systems.
2 min to read
CCW takes previously used, internal-combustion engine buses and remanufactures them into like-new vehicles containing ZEPS all-electric drivetrain systems.
Recently, Complete Coach Works (CCW) announced it was awarded a contract by Montebello Bus Lines (MBL) for the electrification and rehabilitation of three New Flyer buses.
MBL’s decision to remove the now-defunct ISE gas-hybrid system and convert to Zero Emission Propulsion System (ZEPS) buses was a positive step toward its goal of improving the quality of public transportation for its residents and surrounding communities.
Ad Loading...
Developed exclusively by CCW, ZEPS is an integrated technology that provides customers an affordable route to eco-friendly transportation. CCW takes previously used, internal-combustion engine buses and remanufactures them into like-new vehicles containing ZEPS all-electric drivetrain systems. The remanufactured ZEPS buses are rebuilt with lightweight flooring, lightweight seats, lightweight windows, and energy-efficient heating and cooling. It can integrate with any fleet and provide a viable alternative to fossil fuels meeting the needs of clients’ green initiatives.
RELATED: California mandates zero-emission buses by 2040
The process of remanufacturing will improve the service life of the bus and reduce material waste, resulting in operational savings that benefit the environment, the company says. These buses will help MBL to comply with the new California regulation that will be put into effect in the near future.
According to an article published in the New York Times, California has become the first state to mandate a full shift to electric buses on public transit routes. Starting in 2023, a quarter of agencies’ acquired buses must be electric, and by 2026 that requirement will rise to half of all acquired buses. By 2029, mass transit agencies in California will only be allowed to buy buses that are fully electric under a rule adopted by the state’s powerful clean air agency.
Funded through the 2025 Investment Plan, the new R2 Marine–Willingdon RapidBus is expected to begin service in September, more than three months ahead of schedule.
Complete Parts features new branding with a new logo, a new contact telephone number, a dedicated order desk, enhanced processes and inventory, all designed to provide the parts bus operations need.
Accessible transit isn’t a feature—it’s a responsibility. This whitepaper explores how the Low-Floor Frontrunner is redefining mobility with a breakthrough design that removes barriers, empowers riders, and delivers measurable operational advantages for agencies. Discover why this next generation minibus is setting a new standard for inclusive transportation.
SEPTA was awarded $43 million in competitive grant funding from the FTA's FY25 Low and No Emission and Bus and Bus Facilities grant programs to support this procurement.
In part 1 of a two-part conversation, AC Transit’s director of maintenance joins co-hosts Alex Roman and Mark Hollenbeck to discuss his journey from the U.S. Marines to public transit and the role mentorship plays in developing the next generation of industry leaders.
When construction is complete, battery-electric buses will operate from the Arborway facility on Day One, providing cleaner, quieter, and more reliable service for riders, the MBTA said. After completion, the old facility will be demolished, and the land will be made available for redevelopment.
Nadine S. Lee, who has served as president/CEO since July 2021, said the decision comes after careful reflection on the agency’s progress and its path forward.
In this conversation, TBC’s Executive Director Ed Redfern, President Corey Aldridge, and Washington Representative Joel Rubin outline the coalition’s key policy priorities, the challenges facing transit agencies, and how industry stakeholders can work together to strengthen the voice of bus transit at the federal level.