METRO Magazine Logo
MenuMENU
SearchSEARCH

High-speed rail crashworthiness standards recommended

Will provide baseline safety requirements for next-generation rail equipment that would travel up to speeds of 220 mph on high-speed rail tracks, while providing the flexibility to operate with existing freight and passenger systems up to speeds of 125 mph.

June 17, 2013
2 min to read


The Federal Railroad Administration’s (FRA) Railroad Safety Advisory Committee (RSAC) voted unanimously to recommend that the Transportation Secretary work to implement new crashworthiness performance standards for next generation high-speed passenger rail equipment that will operate in the U.S.

The RSAC is FRA’s technical and policy stakeholder body that includes representatives from various rail industry perspectives, including major international rail builders.

Ad Loading...

The standards, which FRA is developing now before they are published later this year in a Notice of Proposed Rulemaking (NPRM), will provide baseline safety requirements for next generation rail equipment that would travel up to speeds of 220 mph on high-speed rail tracks, while providing the flexibility to operate with existing freight and passenger systems up to speeds of 125 mph.

Once finalized through the FRA’s rulemaking process, the new standards would be employed along the Northeast Corridor and in California, regions both designated for high-speed rail service.

The proposed standards are intended to provide an alternative approach to existing railcar crashworthiness requirements that have influenced the type of passenger equipment built and used in the U.S. market for nearly a century. The proposed standards would establish performance-based requirements for an interoperable rail network, permitting the use of “service proven” designs and advanced technologies, while ensuring a consistent, systematic approach to safety.

Since 2009, members of the RSAC have undertaken a review of existing crashworthiness requirements in order to identify a new, technology-neutral, performance-based approach that employs modern and advanced design techniques, such as crash energy management. Consensus on the proposed standards was reached by the RSAC Engineering Task Force, which is made up of a cross section of the domestic and international railcar supply industry, including 12 railcar manufacturers.

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →