METRO Magazine Logo
MenuMENU
SearchSEARCH

Port Authority lights up World Trade Center tower for holidays

The tower, which can now be seen from points in all five New York City boroughs and in New Jersey — has reached the 90th floor, leaving 14 floors remaining.

December 14, 2011
Port Authority lights up World Trade Center tower for holidays

Photo courtesy Port Authority New York and New Jersey.

2 min to read


Photo courtesy Port Authority New York and New Jersey.

To mark the upcoming holiday season, the still-under-construction One World Trade Center tower was illuminated with colored lights on Tuesday.

The Port Authority of New York and New Jersey, which operates many of the busiest and most important transportation links in the region, owns the 16-acre World Trade Center site in Lower Manhattan.

Ad Loading...

Construction workers from Five Star Electric — the tower’s electrical contractor — volunteered their time to place colored cellophane wrapping around the existing interior lights to create the holiday look.

One World Trade Center — which can now be seen from points in all five New York City boroughs and in New Jersey — has reached the 90th floor, leaving 14 floors remaining.

The tower’s glass façade has reached the 65th floor and the concrete floors have been built to the 82nd floor.

The building steel is scheduled to top out in the first quarter of 2012, and the building is scheduled for completion by the end of 2013. Approximately half of the tower’s 3 million square feet of office space has been leased.

With an antenna tower rising 1,776 feet high, One World Trade Center will become the Western Hemisphere's tallest building upon completion.

The property will consist of 3 million square feet of Class-A office space on 71 office floors, a grand public lobby graced with 50-foot ceilings, and an observation deck 1,241 feet above ground, among other amenities. Designed by world-renowned architect David Childs of Skidmore Owings & Merrill, One World Trade Center is expected to be the most environmentally sustainable project of its size in the world. The project incorporates a range of environmentally sensitive features based on LEED Gold criteria established by the U.S. Green Building Council.

Workers commuting to and from One World Trade Center will enjoy seamless access to an unprecedented confluence of mass transit services. Ultra-modern, climate-controlled corridors will connect the tower to The World Trade Center Transportation Hub — designed by architect Santiago Calatrava — and the new PATH terminal, 11 NYC Transit subway lines and the new Fulton Street Transit Center, the World Financial Center and ferry terminal, and at least 360,000 square feet of world-class shopping and dining.

Image of One World Trade Center tower taken November 2011. Photo

Joe Woolhead.

 

World Trade Center Transportation Hall - Transit Hall Level Rendering.

Santiago Calatrava Courtesy: Silverstein Properties

 

More Rail

A photo of an Amtrak train with a logo
Railby Staff and News ReportsSeptember 17, 2026

Amtrak, CN Reach Agreements to Strengthen Passenger Rail Service, Safety

The agreement resolves a more than decade-long proceeding before the Surface Transportation Board concerning the terms and conditions for Amtrak services, such as the City of New Orleans, Illini/Saluki, and Wolverine.

Read More →
A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
Ad Loading...
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
Ad Loading...
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
Ad Loading...
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →