METRO Magazine Logo
MenuMENU
SearchSEARCH

Wash. Metro Transit to debut BRT line

The RapidRide B Line, featuring 60-foot articulated buses built by New Flyer, will connect the cities of Bellevue and Redmond.

September 29, 2011
Wash. Metro Transit to debut BRT line

Photo credit Ned Ahrens

3 min to read


Photo credit Ned Ahrens

Washington's King County Metro Transit will debut its new bus rapid transit (BRT) service this weekend. The RapidRide B Line, which features newly designed buses, shelters and signs, will connect the cities of Bellevue and Redmond.

The B Line will start carrying passengers at 6 a.m. this Saturday, and rides will be free all weekend. It is the second of Metro’s six planned RapidRide routes.

The A Line debuted a year ago has increased bus ridership by 30 percent to 40 percent in its corridor. Similar results are expected for the B Line, according to transit officials, with Eastside RapidRide ridership projected to increase to nearly 2.2 million passenger trips a year by 2016.

Photo credit Ned Ahrens

The service includes newly designed buses, shelters and signs. The distinctive red and yellow buses are energy efficient, low-emission hybrid vehicles with low floors and three doors for easier, faster boarding. The B Line was funded with $20.2 in federal funding in addition to local dollars.

Ad Loading...

The service, which travels between the Bellevue and Redmond transit centers, features 60-foot articulated buses with three doors for faster boarding. The vehicles, built by New Flyer, have free Wi-Fi, interior and exterior stop announcements, security cameras, and a passive restraint system to speed boarding time for those using wheelchairs and other mobility devices.

The B Line is expected to operate about 20 percent faster than the current routes in those corridors. This is achieved by combining bus stops, quicker fare collection with off-board payment at major stations, and transit signal priority that either extends or provides green lights for arriving B Line buses, according to officials.

The B Line has 19 RapidRide stations installed at locations that currently have the most transit use. Station amenities include: large shelters with interior lighting; real-time arrival information; ORCA card readers; benches; and a lighted signal that passengers can activate to let bus drivers know there is someone waiting. The remaining 28 stops along the line also have benches and the passenger-activated lights.

Photo credit Ned Ahrens

Buses are scheduled to arrive every 10 minutes on weekdays during the busiest travel hours, and every 15 minutes during most other times of the day and week before 10 p.m. During the late-night and early-morning hours, it operates every 30 minutes. On weekdays, it operates from 4:30 a.m. to approximately 1 a.m.

Because of the way the B Line connects the Eastside, Metro is also restructuring much of its bus service in Bellevue, Redmond and Kirkland to improve the efficiency of the transit network and to integrate with the new RapidRide service. The revisions also begin Oct. 1 and include: significantly revised routing for 11 routes; elimination of 12 routes to avoid duplication of service; and three new routes to fill in the network.

More Bus

A Nova LFSe+ electric bus for STM
Technologyby Staff and News ReportsJune 18, 2026

Biz Briefs: Montréal Debuts Nova Electric Buses and More

In this edition of Biz Briefs, we spotlight the latest developments shaping the future of mobility.

Read More →
Zero-emissions bus with FLEETWATCH technology
ManagementJune 17, 2026

The Hidden Cost of Fuel Data Inaccuracy in Public Transit Fleets

In today's transit environment, accurate fuel and mileage data are critical to reducing costs, minimizing downtime, and improving fleet performance.

Read More →
Six-Year Plan Boosts Virginia Transit, Rail Investments
Managementby StaffJune 17, 2026

Virginia's $28.5B Transportation Plan Targets Transit and Rail

Approved by the Commonwealth Transportation Board, the program supports ongoing infrastructure projects while providing new investments in transit, state of good repair and transportation alternatives.

Read More →
Ad Loading...
Group announcing BUSES Act
Motorcoachby StaffJune 16, 2026

Bipartisan BUSES Act Seeks Changes to New York City's Bus Idling Enforcement Program

Backed by motorcoach operators, the legislation seeks to balance emissions goals with passenger safety by allowing limited idling for inspections, accessibility needs and extreme weather conditions.

Read More →
An LA Metro D Line train in Union Station
Managementby StaffJune 16, 2026

D Line Expansion Fuels Growth Across LA Metro's Rail System

Weekend rail ridership was especially strong, soaring 18% as riders embraced expanded access to jobs, entertainment, dining, and cultural destinations, said the agency. Total system ridership for May, including bus and rail, was 26,966,657.

Read More →
An ENC bus being manufactured in its facility.
Busby StaffJune 10, 2026

ENC to Deliver Three Clean Diesel Buses to Canada's York Region Transit

Since 2005, City View and ENC have supplied nearly 90 E-Z Rider II buses to YRT.

Read More →
Ad Loading...
Frontrunner's new facility in Billerica, Massachusetts.
Busby StaffJune 8, 2026

Frontrunner Bus Group Expands with New Massachusetts Headquarters

The significantly larger facility will provide the infrastructure needed to support the company’s growing workforce, advanced technologies, and expanding product line.

Read More →
New MobilityJune 5, 2026

Joshua Schank on Transportation Innovation, Risk, and the Future of Mobility

In this edition of METROspectives, Joshua Schank discusses lessons from launching LA Metro’s Office of Extraordinary Innovation, the challenges of advancing new mobility technologies, and much more.

Read More →
A maintenance person with a tablet.
ManagementJune 5, 2026

Reinventing Fleet Maintenance with Real-time Visibility and AI

Transit leaders need to know what needs fixing, where to look, who is responsible, when work is completed, and what it costs without having to chase information across disconnected systems.

Read More →
Ad Loading...
SamTrans planning for ballot measure
Managementby StaffJune 4, 2026

SamTrans Sets Priorities for Potential Connect Bay Area Revenue

The board-approved framework allocates future funding to maintaining service, rider improvements, equity initiatives, and infrastructure repairs.

Read More →