Wash. Metro Transit to debut BRT line
The RapidRide B Line, featuring 60-foot articulated buses built by New Flyer, will connect the cities of Bellevue and Redmond.

Photo credit Ned Ahrens
Washington's King County Metro Transit will debut its new bus rapid transit (BRT) service this weekend. The RapidRide B Line, which features newly designed buses, shelters and signs, will connect the cities of Bellevue and Redmond.
The B Line will start carrying passengers at 6 a.m. this Saturday, and rides will be free all weekend. It is the second of Metro’s six planned RapidRide routes.
The A Line debuted a year ago has increased bus ridership by 30 percent to 40 percent in its corridor. Similar results are expected for the B Line, according to transit officials, with Eastside RapidRide ridership projected to increase to nearly 2.2 million passenger trips a year by 2016.

Photo
Ned Ahrens
The service includes newly designed buses, shelters and signs. The distinctive red and yellow buses are energy efficient, low-emission hybrid vehicles with low floors and three doors for easier, faster boarding. The B Line was funded with $20.2 in federal funding in addition to local dollars.
The service, which travels between the Bellevue and Redmond transit centers, features 60-foot articulated buses with three doors for faster boarding. The vehicles, built by New Flyer, have free Wi-Fi, interior and exterior stop announcements, security cameras, and a passive restraint system to speed boarding time for those using wheelchairs and other mobility devices.
The B Line is expected to operate about 20 percent faster than the current routes in those corridors. This is achieved by combining bus stops, quicker fare collection with off-board payment at major stations, and transit signal priority that either extends or provides green lights for arriving B Line buses, according to officials.
The B Line has 19 RapidRide stations installed at locations that currently have the most transit use. Station amenities include: large shelters with interior lighting; real-time arrival information; ORCA card readers; benches; and a lighted signal that passengers can activate to let bus drivers know there is someone waiting. The remaining 28 stops along the line also have benches and the passenger-activated lights.
Buses are scheduled to arrive every 10 minutes on weekdays during the busiest travel hours, and every 15 minutes during most other times of the day and week before 10 p.m. During the late-night and early-morning hours, it operates every 30 minutes. On weekdays, it operates from 4:30 a.m. to approximately 1 a.m.
Because of the way the B Line connects the Eastside, Metro is also restructuring much of its bus service in Bellevue, Redmond and Kirkland to improve the efficiency of the transit network and to integrate with the new RapidRide service. The revisions also begin Oct. 1 and include: significantly revised routing for 11 routes; elimination of 12 routes to avoid duplication of service; and three new routes to fill in the network.
More Bus

Brian Dickson on Building Stronger, More Resilient Transportation Organizations
Bus Business Consultants Founder Brian Dickson discusses the leadership principles, operational discipline, and strategic planning that separate transportation companies positioned for long-term success from those stuck in survival mode.
Read More →
LA Metro Breaks Ground on Vermont BRT Project
The 12.4-mile corridor is projected to serve 66,200 daily riders, reduce travel times by up to 24%, and create the nation's busiest bus rapid transit corridor.
Read More →
Roman Cornell on ABC Companies’ Evolution and the Future of Passenger Transportation
The company’s CEO discusses carrying forward a third-generation family legacy, ABC’s continued evolution in passenger transportation, support for increasingly complex fleets, and how technology and continued investment could help operators improve uptime.
Read More →
VIA Bus Ridership Grows 10.1% Through August 2026
San Antonio's VIA Metropolitan Transit reported the highest bus ridership growth among major Texas transit systems. Federal Transit Administration data ranked it second among the nation's 50 largest transit systems.
Read More →
LA Metro September Ridership Climbs 3.9%, Led by Rail Growth
The agency recorded more than 27.2 million boardings, with rail ridership increasing 12.4% year over year and the D Line posting the largest gains.
Read More →
Frontrunner Bus Group Introduces XF Low-Floor Bus with Enhanced Accessibility
The new mid-sized bus features a full flat-floor design, eight-inch curbside step-in height, and zero-entry rear ramp to improve passenger access and operational flexibility.
Read More →
Scenes from APTA TRANSform & EXPO 2026
Transit leaders, manufacturers, and industry professionals gathered in Chicago to explore new technologies, share ideas, and discuss the future of public transportation.
Read More →
More Than a Summer Job: Building the Next Generation of Transit Talent
The Delaware River Port Authority and PATCO have transformed their internship program into a hands-on professional development experience that introduces students to the breadth of transportation careers — and creates a pipeline for future employees.
Read More →
LA Metro Board Awards 220 Battery-Electric Bus Contract to ENC
The contract, which is the largest base award of battery-electric buses by a U.S. transit agency, will be built in Southern California, sustaining good jobs as LA prepares to welcome the world in 2028
Read More →
Public Transit Conference Returning to GFX in 2027, Call for Papers Now Open
The Call for Papers is now open, allowing transit agency professionals and industry experts to help shape the PTC educational program by submitting session ideas for consideration.
Read More →