
Adds an additional 76,000 square feet of space, bringing the total campus to nearly 400,000 square feet of manufacturing capacity.
Read More →
Career includes public and private sector experience with positions as planner, engineer, maintenance director, GM, and executive director.
Read More →
The ProteanDrive in-wheel eDrive system will help optimize interior space and simplify powertrain integration.
Read More →
The system is designed to ensure new levels of rider independence, safety, and dignity.
Read More →
According to the report, CTA, Pace, and Metra ranked in the top half of their peer groups for 14 of the 16 measures reviewed and in the top three for seven of those measures.
Read More →
The project would occur in three phases. The first would include relocation of the T’s bus services to the Burgin Parkway side of the station. Then, about 300 apartments would be built on what is now the bus loop, access road, and parking lot in front of the station.
Read More →
UCLA partnered with VIMOC Technologies to optimize curb space for efficiency and safety in the university's Gateway Plaza loop.
Read More →
Considerations for cities to improve safety, prioritize people and public space, strengthen mass transit, and manage curb space for automated vehicles.
Read More →
The 10.3-mile tunnel will be the first portion of the underground hyperloop system that the SpaceX founder wants to build between Washington, D.C. and New York City.
Read More →
The Vehicle Innovation Center is a state-of-the-art manufacturing lab, featuring virtual reality learning spaces, driving simulators, and other interactive exhibits.
Read More →