Loading data...
A slowdown beginning at the end of April and lasting eight weeks caused about 100 people to be temporarily laid off from Bombardier’s Plattsburgh, N.Y., plant.
Read More →System at Hartsfield-Jackson Airport first opened in September 1980. Since opening, the system has seen fleet expansions, extensions to the international concourse, two generations of replacement vehicles and numerous system upgrades.
Read More →The entire elevated dual-lane system at George Bush Intercontinental serves four stations (Terminals A, B, C and D/E) and operates with a fleet of 16 Innovia APM 100 vehicles (formerly known as CX-100) and Bombardier Cityflo automatic train control technology.
Read More →Bombardier Inc. announced it has signed an agreement with DaimlerChrysler AG to acquire its subsidiary DaimlerChrysler Rail Systems GmbH (Adtranz), based in Berlin.
Read More →The framework contract contemplates the design and manufacturing of 860 double-deck electrical multiple units for a total of approximately $11 billion. SNCF also signed a first firm order for 80 trains valued at approximately $1.1 billion.
Read More →The first contract is a Manufacturing and Supply Agreement covering the design, manufacture, commissioning and entry into service of 180 new vehicles, and the second is a 35-year Train Services Agreement providing maintenance for the new vehicles.
Read More →Through this agreement, STM will benefit from the replacement of part of its fleet at a lower cost.
Read More →The company will cut 18.5% of its workforce and close seven European plants over the next two years.
Read More →Average weekday ridership on all three MARC lines is roughly 37,500 riders. The MARC III bi-level commuter railcars have been in service nearly 17 years.
Read More →Initially, BT Signaling B.V. will purchase a 25 percent stake in Elteza. Following further approval, BT Signaling B.V. will increase its stake to nearly 50 percent. RZD will remain the majority shareholder.
Read More →