Loading data...
The 60-foot low-floor buses are replacing high floor buses and include newly installed ramps, remanufactured power trains, transmissions, engines, brakes, and are equipped with two ADA-compliant wheelchair positions.
Read More →Company increased its Zero Emission Propulsion System battery pack to 466 kWh to boost power and range.
Read More →MTA will test 10 new buses by Proterra and New Flyer with the hope of ordering an additional 60 all-electric buses.
Read More →The FTA had earlier notified LBT that BYD submitted an invalid DBE certification during the procurement process leading to the original April 29, 2013 agreement, and that the contract between LBT and BYD Motors Inc. was therefore not eligible for federal funding.
Read More →Edwin Thomas was stabbed by Horace Moore, on Dec. 1, 2008, in the chest and torso in front of passengers after trying to use an invalid MetroCard and demanding a transfer.
Read More →System uses a charging pad that lies flush with the pavement, is sturdy enough to be run over all day without damage, and wirelessly charges the bus during routine stops.
Read More →Part of the year-long study will be to see how the bus tests in a cold environment, as it has only been run in warmer climates, according to MTA officials.
Read More →Projects will be evaluated by criteria defined in federal law and in the Notice of Funding Opportunity, including the applicant’s demonstration of need and the project’s anticipated reductions in energy consumption compared to standard buses.
Read More →Eleven of the buses will operate on Transport for London’s route 153 from February 2018, with a further 19 electric buses operating on route 214 from August 2019.
Read More →The $6.2M contract, awarded to Siemens Mobility Inc., includes purchase, installation, and warranty of cameras and computers.
Read More →