Loading data...
Areas examined by the auditors included Metro’s General Mobility Program, which provides approximately $100 million annually to the region for new roads and infrastructure.
Read More →The final report shows an increase in customer boardings and estimates a reduction of approximately nine million vehicle miles traveled during July and August.
Read More →The study outlines a roadmap for increasing train throughput while preparing Penn Station for future growth across the Northeast Corridor.
Read More →The milestone, known as the "Operational Readiness Date," marks the point where provisional care and control of the extension is formally transferred from the Metropolitan Washington Airports Authority to the agency.
Read More →Brightline, the brand new higher speed train currently under construction in Florida, released images of the first passenger train shell built by Siemens. The 85-foot-long sheel, built by more than 70 employees, will carry 240 passengers. This vehicle is part of Brightline's initial five four-car train sets.
Read More →The train, as envisioned, would depart from Lynchburg and head to Washington, D.C. and New York before returning the next day.
Read More →Works within the real-time predictions for each subway line, being triggered when a train has spent two minutes longer than predicted in an area of track.
Read More →This new train, an evolution of the former Pendolino high speed train, can reach a maximum speed of 155 mph. Measuring 614 feet long, the train will be composed of 7 cars accommodating around 480 passengers.
Read More →Provides connectivity for CCTV, passenger counting, seat reservation indicators, media displays and energy metering.
Read More →The train’s arrival at the San Bernardino Depot Train Station marks a significant milestone on its incredible journey from concept to reality.
Read More →