He had proposed placing the 457-mile route under U.S. government control and requiring competitive bidding to build tracks and run trains as fast as 220 miles per hour between Washington and Boston.
Read More →The first document was a draft of a new Small Business Policy, outlining contracting requirements to advance the participation of Small Businesses (SBs), Disabled Veteran Business Enterprises (DVBE), Disadvantaged Business Enterprises (DBEs) and Micro-Businesses in the authority's procurement process.
Read More →Concurrent with the new plan, Al Engel, VP of High-Speed Rail, has advised the company he is leaving in December to pursue other opportunities.
Read More →The new project business plan shows that the project costs over a 20-year construction period will be much higher than the initially projected $43 billion. However, it is forecast to be profitable even with low ridership numbers and would not require public operating subsidies.
Read More →Funds will support track and signal improvements between Detroit and Kalamazoo, Mich., which will allow for speeds of up to 110 mph on 77 percent of Amtrak’s Wolverine and Blue Water services between Detroit and Chicago, resulting in a 30-minute reduction in travel time between those destinations.
Read More →In response to stakeholder, agency and public feedback on the high-speed train alignment that bypasses Hanford to the east, the authority will re-introduce an alternative route, along with an alternative station location to serve the Kings/Tulare region along that portion of the Fresno to Bakersfield section.
Read More →Funding will advance the development of the Southeast High-Speed Rail Corridor, which will link Raleigh, N.C., to Washington, D.C. via Richmond, Va.
Read More →The 8th World Congress on High-Speed Rail will address strategic issues linked to the national and international development of high-speed rail systems will be addressed at this global event.
Read More →Recommends prioritizing corridors with demonstrated markets, such as the Northeast and California, and exploring alternative management and financing arrangements, including separating infrastructure development from rail operations and forming public-private partnerships.
Read More →
Will upgrade high-speed and intercity passenger rail service on the Empire Corridor to increase capacity and reliability, while reducing delays and travel time on several Amtrak routes, including the Empire Service, Lake Shore Limited, Maple Leaf, Adirondack, and Ethan Allen Express.
Read More →