Michigan awarded $197M for track, signal upgrades
Funds will support track and signal improvements between Detroit and Kalamazoo, Mich., which will allow for speeds of up to 110 mph on 77 percent of Amtrak’s Wolverine and Blue Water services between Detroit and Chicago, resulting in a 30-minute reduction in travel time between those destinations.
The Michigan Department of Transportation (MDOT) was awarded a $196.5 million grant from the U.S. Department of Transportation (DOT) for track and signal improvements between Detroit and Kalamazoo, Mich.
These improvements will allow for speeds of up to 110 mph on 77 percent of Amtrak’s Wolverine and Blue Water services between Detroit and Chicago, resulting in a 30-minute reduction in travel time between those destinations.
Dollars for this 135-mile segment between Detroit and Kalamazoo will support preliminary engineering, final design and construction. The project includes new, continuously welded rail and ties, fiber optic lines and infrastructure to support a positive train control system, rebuilding 180 highway-rail grade crossings, and gates and flashers at 65 private highway-rail grade crossings.
The project will create approximately 800 new jobs during the construction phase, which is expected to begin late spring 2012, and will facilitate service to current and future freight rail customers, including major shippers like Ford Motor Co.
In addition, MDOT is designated to receive a $150 million DOT grant later this year to purchase this 135-mile segment of track, when grant conditions are met. This will allow for the implementation of 110-mph service along the corridor that will bring improved passenger service, ensure capacity for freight operations through double tracking on the busiest freight segment and deliver long-term economic benefits in Michigan.
The Wolverine and Blue Water routes are part of the Midwest rail network, which has a population base of about 29 million people 100miles to 500 miles from one another. Midwestern states have been working cooperatively together to plan and further develop an integrated, multi-state passenger rail network.
In addition to the goal of expanding service to new cities, trains in the system will travel at 110 mph on the primary routes and 90 mph on secondary lines, reducing travel time, and increasing reliability and on-time performance.
More Rail

Trinity Metro Breaks Ground on $270M TEXRail Extension
The 2.1-mile extension will connect Fort Worth’s Medical District and Near Southside to downtown, surrounding communities, and Dallas-Fort Worth International Airport.
Read More →
Bringing Austin’s First Light Rail System to Life
Austin Transit Partnership CEO Greg Canally discusses the city's nearly 10-mile light rail project, its collaborative approach to project delivery, the importance of community engagement, and the milestones ahead as construction approaches in 2027.
Read More →
Metra Draft Plan Outlines Costs, Service Improvements for Regional Rail
The Systemwide Network Plan identifies infrastructure needs and potential investments to expand all-day, bidirectional rail service across the Chicago region.
Read More →
Amtrak Completes First Street Tunnel Upgrades, Restores Service
The nine-day construction project included replacing aging track infrastructure and modernizing switch systems near Washington Union Station.
Read More →
FRA Announces $2.3B for Passenger, Freight Rail Projects Nationwide
The CRISI Grant Program funding will support rail infrastructure improvements, safety upgrades, and projects aimed at improving freight and passenger rail service across 45 states and Washington, D.C.
Read More →
Caltrain’s Electrification Drives a New Era of Ridership Growth
The railroad’s shift to electric service has brought more frequent trains, stronger customer satisfaction, and increased ridership, earning it APTA’s Outstanding Public Transportation System award.
Read More →
FTA Advances $164M Broward County Commuter Rail Project
The proposed 10.5-mile commuter rail extension would connect Fort Lauderdale and Aventura, expanding passenger rail options in South Florida.
Read More →
New York MTA Launches Historic $1.9B Signal, Track Modernization Project
Funded in part by congestion pricing revenue, the project will replace nearly century-old signals along the A and C lines in Brooklyn and Queens.
Read More →
LA Metro Breaks Ground on East San Fernando Valley Light Rail Project
The 6.7-mile line will add 11 stations along Van Nuys Boulevard, expand access to jobs and regional transit connections, and support Metro’s broader efforts to improve mobility as rail ridership grows.
Read More →
CSA Group Releases Climate Resilience Standard for Transit, Passenger Rail
Developed with support from the Standards Council of Canada, CSA D700 guides assessing climate-related risks and planning adaptation measures for transit and passenger rail systems.
Read More →