The five-year contract is worth more than $42.9 million. Over the course of the contract, which will take effect on October 1, the network will increase by 50 percent as line extensions are put into service.
Read More →The contract, worth $13.1 million, includes the complete replacement of the door systems and upgrade of the wheelchair lifts, as well as the wreck repair of one car.
Read More →Will provide 12 trainsets composed of four cars each, featuring a signaling system for automatic train operation, low floors and illuminated information boards.
Read More →The STEEM (Maximised Energy Efficiency Tramway System) project will enable the trams to run without catenary power, allowing them to be integrated more effectively into the urban environment and generate energy and infrastructure savings.
Read More →Midwest High Speed Rail Association is asking the state of Illinois to seek $10 million in ARRA funds to conduct a detailed alternatives analysis and environmental study for the route.
Read More →Company will design, engineer and manufacture the equipment as well as supervise its installation and testing.
Read More →Egypt contracts are valued at a total of $180 million, and concern the second phase of construction of Line 3 metro system. Belgian project is the first European cross-border, high-speed line equipped with Level 2 ERTMS technology.
Read More →The Prima II can operate on different national rail networks and offers operators the possibility of adjusting its configuration.
Read More →
The contract, worth $159.4 million, consists of a firm order, worth $88.6 million, which includes design studies, building a scale 1 model and manufacturing the trainsets.
Read More →In summer 2011, the company will deliver a new generation Smartlock computerized control unit (PAI-NG), the second such delivery under the framework contract signed by the two companies in 2006.
Read More →