In energy savings mode, the energy storage unit absorbs the energy generated by braking rail vehicles and stores it until the system can safely feed it back to the power supply during vehicle acceleration.
Read More →The low number is caused by aging trains, run-down tracks, outdated scheduling and few reserve vehicles to deploy when rail vehicles break down. The agency plans to update its scheduling, hire more supervisors and put out a bid next year for a new batch of light rail vehicles, which could be in service by 2017.
Read More →
The features include a 100% low floor design and the ability to operate at speeds of up to 65 mph.
Read More →The request for proposals is the final step in choosing one of three construction groups for the estimated $536-million contract to build light rail in Kitchener and Waterloo.
Read More →Per a $73 million contract, the 18 vehicles will be manufactured from start to finish at Siemens' rail vehicle manufacturing plant in Sacramento, Calif., a facility powered almost entirely by two megawatts of solar energy. The first new rail cars are expected to be delivered in August 2014.
Read More →
The Metro system will include the Metro Red Line bus rapid transit on Cedar Avenue, which begins service June 22, and Metro Green Line light rail service between the downtown areas in both St. Paul and Minneapolis, with service beginning in mid-2014.
Read More →
Twenty-seven light rail vehicles will be retrofitted with an ultra capacitor-based, energy storage system, which captures and stores regenerative braking energy as it is generated, uses the stored energy for acceleration and releases surplus energy to other vehicles on the system as needed.
Read More →The board plans on meeting at the end of April to take public comment on the participation-withdrawal question and to gather more information from Columbia River Crossing officials before voting in mid-May.
Read More →Planners are seeking public input on a proposed 27-mile route that would operate along the proposed 3.4-mile Woodward Avenue light rail project.
Read More →Even though the agency’s board of directors only voted to seek offers from consultants to continue developing the concept, some board members expressed concerns about moving forward on an effort that was shot down in last year's election.
Read More →