Loading data...
The $10 billion program is designed to upgrade rail infrastructure and enhance service ahead of the 2028 Los Angeles Olympic and Paralympic Games.
Read More →The Miami International Airport Station is the centerpiece of a comprehensive program of both roadway and transit improvements, which provided $404.7 million in funding.
Read More →The $523 million North Shore Connector shuttles passengers between the new Gateway Station downtown to the elevated Allegheny Station, adjacent to Heinz Field on the North Shore.
Read More →Analysis compares consumer and societal costs associated with 20 trips between select U.S. city pairs on both Amtrak and scheduled intercity motorcoaches. Findings include motorcoaches average less than 25% of the cost to provide comparable Amtrak Service; and only two Amtrak lines generate enough revenue to cover operating and capital costs.
Read More →The line will provide access to 30,000 University of Washington students and 29,000 faculty and staff, ease congestion along Seattle’s most heavily-traveled north-south corridors and provide better access to the area’s largest urban centers.
Read More →Funds will be used to renovate the station's interior lobby, bathrooms, ticketing areas and offices, lighting, signage and to make the station ADA-compliant.
Read More →Analyses conducted by the FTA, an engineering firm and Sound Transit all concluded that, despite forged information related to the grade of steel used in some guideway foundations, the system is structurally sound.
Read More →The plan, which was first announced in January 2015, has been slightly changed and is expected to open by 2021.
Read More →According to recent reports, the move comes amid criticism that it's taken too long to make improvements.
Read More →Delivering new rail, trackwork turnouts, contact rail, coverboards, insulator assemblies and bonded insulated joints. The Fern Rock Yard Track Renewal Project is completely funded by The American Recovery and Reinvestment Act of 2009.
Read More →