
Fresh off the release of the Q'POD at 2008's APTA EXPO, Q'Straint unveiled the Quantum system at this year's EXPO.
Read More →HRT estimates about 40 percent of trips, mostly at night and on weekends, will be moved to cabs, beginning in December.
Read More →Agency approved a service cut plan that will save $10.7 million next year, but included a last-minute amendment that saves peak-hour service on one bus route crucial to many blind transit users.
Read More →Bringing numerous stakeholders with varying agendas together to build a strong coalition with united goals, is an effective way for a community to create, advance or improve accessible transportation.
Read More →Paul J. Ballard was awarded for exceptional leadership in providing Nashville with an outstanding accessible transit system at the 30th Annual Awards for Artists with Disabilities. Under his leadership, Nashville MTA’s bus ridership has increased from 6.4 million annual passenger trips to a high of 9.4 million passenger trips. More than 175 new accessible buses and vans have been added to the fleet during his tenure.
Read More →
The new Plauderville Station is fully accessible to customers with disabilities, provides more convenient access to the station from the parking area and features platforms constructed with Armor Deck, a material with a structural polymer composite system used in place of concrete that resists corrosion and is maintenance-free.
Read More →
The Quantum is the first and only securement system that secures a wheelchair, without need for driver assistance. Quantum's arms deploy at the press of a button, securing all mobility devices at the wheels.
Read More →
Both Ricon and Braun lifts are available, depending on original coach specifications.
Read More →Passenger railroads must provide level-entry boarding at new or altered stations in which no track passing through the station and adjacent to platforms is shared with existing freight rail operations.
Read More →New high-level platforms provide accessibility to customers with disabilities. Agency also rebuilt elevator shafts, a pedestrian tunnel, tunnel stairs and exterior stairs to South Bridge Street, and installed closed-circuit television cameras, new ticket vending machines and electronic customer information signs.
Read More →