Loading data...
From the 'Bus Barn' this month arises two very important concerns regarding the use of bus simulator supplemental training: performance management and speed control. During the past year, I had the pleasure of visiting and conducting several train the trainer sessions at transit agencies in North America and Canada. I was pleased to see the passion among the trainers, as this is a necessary ingredient.
Read More →The SUV driver died, along with five passengers on the train, in the Feb. 3, 2015, accident. The rail passengers were killed when 343 feet of the third rail, which powers the train, penetrated the floor of the first train car and struck passengers.
Read More →Authorities search train and question about 300 riders and crewmembers.
Read More →The contract is worth approximately $78 million. The trains to be equipped are 71 ICE-T tilting trains and 50 ICE3 trains, which are operated in Germany, Austria and Switzerland.
Read More →The extensive project will equip seven MTR lines with the latest Communications Based Train Control technology, safely adding capacity, reliability and maintainability on the existing infrastructure system.
Read More →Axonis is an elevated metro system able to transport from 15 to 45,000 passengers per hour per direction, while Urbalis Fluence is the first vehicle-centric communications-based train control system.
Read More →At an estimated cost of $67 million, the installation is part of the railroad's ongoing effort to bring its entire infrastructure into a state of good repair.
Read More →Software provider ranked by magazine’s Inc. 5,000 list of the fastest-growing private companies in the U.S. Acknowledged because of its revenue growth of 208.2 percent from 2005 to 2008. Ranked 1,528 on the overall list.
Read More →