Loading data...
It would prevent the Columbia River Crossing project from going forward if it includes a light rail component. The state has yet to come up with the funds for light rail operation and maintenance.
Read More →Light rail vehicles will travel across the Homer M. Hadley Memorial Bridge over Lake Washington. It will be the first light rail line in the world to operate on a floating bridge.
Read More →The new regulations require performance-based inspections, a process designed to minimize rail defects, which will generally result in an increase in tests performed over a designated area of track.
Read More →The total amount of the contract with contingency funding is $1.4 billion.
Read More →The straightforward and user-friendly system superimposes the corridor map on top of a Google map, which shows the precise location of the train.
Read More →As cyber threats grow more sophisticated, rail operators must move beyond compliance-based security measures and adopt integrated, risk-based strategies that protect critical infrastructure, maintain safe operations, and build long-term resilience.
Read More →States must receive FTA certification by April 15, 2019 or new federal transit funds cannot be awarded.
Read More →It shares signature elements with other Eagle P3 commuter rail stations, such as its glass-and-steel elevator, but custom components make it unique among all other stations — such as its 24 by 14 foot pedestrian underpass.
Read More →The board unanimously approved a resolution authorizing OCTA CEO Darrell E. Johnson to take all necessary steps to protect a vital stretch of track through San Clemente, where recent landslides, beach erosion, and degrading riprap pose a serious threat to the rail line.
Read More →