
Work will include improvements to the signaling, tracks, and overhead wires that delivers the electricity to power the trains.
Read More →
Prospect Av Station features enhanced lighting, countdown clocks, improved signage, Wi-Fi connectivity, security cameras, new street-level canopies with digital displays and new art.
Read More →
New York City's Second Avenue Subway will be the first major expansion of the subway system in over 50 years. When fully completed, the line will stretch 8.5 miles along the length of Manhattan's East Side, from 125th Street in Harlem to Hanover Square in Lower Manhattan. In addition, a track connection to the existing 63rd Street and Broadway Lines will allow a second subway line to provide direct service from East Harlem and the Upper East Side to West Midtown via the Broadway express tracks.
Read More →
A developer would make the upgrades, including a new entrance on 42nd street to the Times Square shuttle platform; knocking out a wall to create a larger mezzanine near the Lexington Avenue line; and thinner columns that would let people slip more easily from the subway to the staircases, in exchange for city approval to build a 1.6 million-square-foot office building.
Read More →Included new fixtures and more accessible stalls. The agencies will invest $2.2 million more over the next 18 months on station upgrades, including a new ADA-compliant passenger information display system.
Read More →Agency is replacing the station platform, canopy, staircases, elevator and escalator as well as the platform waiting room, lighting, public address system and signage at the Massapequa Station.
Read More →
The two-year, $66.5 million project breathed new life into the unique subway station that serves the 2 and 5 lines a link to two major Bronx attractions — the Bronx Zoo and the New York Botanical Gardens.
Read More →Will upgrade the Watsessing Station building exterior to preserve the historic character of the station; make site improvements surrounding the building at the street and platform levels; and install CCTV cameras, passenger communication systems and updated signage to enhance the overall customer experience.
Read More →The $38.3 million project was completed in preparation for the expansion of Amtrak’s Downeaster line, which will begin serving Brunswick and Freeport, Maine this fall.
Read More →The $740,000 will be used to improve safety, security and fare compliance at the Gresham Central MAX station and stations along the Eastside MAX line.
Read More →