
Learn more about how 2025 Rail Safety Week seeks to heighten awareness in preventing railroad crossing and trespass incidents.
Read More →
Major projects include replacing aging bridges on the UP North Line, track, electrical and signal upgrades on the Metra Electric, and major tie replacement projects on three lines.
Read More →
Since 2023, the MBTA removed more than 220 speed restrictions and replaced 250,000 feet of rail across the system, saving riders 2.4 million minutes every weekday and generating nearly $1 million in economic benefit every day.
Read More →
The grants will fund a variety of crossing safety and trespass prevention public education projects, which also will be conducted in conjunction with the nonprofit safety group’s observance of “See Tracks? Think Train!” Week, September 23 to 29.
Read More →
Under the NPRM, transit agencies nationwide would be required to create a protection program geared at personnel who work on or around the tracks, implement comprehensive training for workers, and ensure unsafe acts and conditions are reported.
Read More →
With all 33 steel beams for the foundation of the wall in place and Amtrak conducting its own risk analysis, the team has agreed that limited Pacific Surfliner service can safely resume to and from San Diego through San Clemente.
Read More →
The new funding from the state allows the OCTA and Metrolink project team to move forward on constructing a catchment wall at Mariposa Point in San Clemente, as well as other mitigation to protect the track from soil and debris.
Read More →
The investigations revealed deficiencies in track inspection processes, including inconsistencies in documentation and oversight. Both concluded improvements are imperative in terms of leadership, standardizing procedures, increasing staffing and training, and clearly outlining roles and responsibilities.
Read More →
While this work may result in occasional temporary inconveniences, Amtrak said the long-term customer benefits are many, including increased reliability and improved on-time performance.
Read More →
The Burbank Junction Speed Improvement Project ill realign a portion of existing main line track, reconfigure and lengthen track, improve and replace approximately one-half mile of existing track, and install new right of way safety fencing.
Read More →