
FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
The Miami International Airport Station is the centerpiece of a comprehensive program of both roadway and transit improvements, which provided $404.7 million in funding.
Read More →Along with the train system control center, the facility will house a maintenance building for track inspection and repairs; a train vehicle wash facility; and train wheel repair center.
Read More →The refurbishment will add approximately 15 years of additional useful life to the vehicles, while new vehicles are typically built to last 30 years. Siemens will also modernize the vehicle's communications, event recorders and auxiliary power systems.
Read More →R&O Construction's responsibilities for the X Train's Las Vegas Station include assembling a project team, choosing subcontractors, and evaluating design for budget and time considerations.
Read More →Completed phase one and two of the process, which included creating an enclosed structure over two tracks and a new three-story maintenance warehouse and administrative office that replaced functions formerly performed in trailers.
Read More →A transportation expert and a university professor are looking to leverage Las Vegas’ potential as a high-speed rail transportation hub to develop a university program dedicated to researching high-speed rail.
Read More →A long-time policy allowing rail operators to use their discretion in how long they waited at stations for commuters to board appeared to have been scrapped this week due to a memo issued by a Chicago Transit Authority GM.
Read More →Customers rated their overall satisfaction with the transit service as above average with a score of 6.0 — a substantial increase over the baseline rating of 5.2 — achieving the agency’s FY 2012 goal of 6.0 for customer satisfaction.
Read More →Installation of an advanced signal system is a component of the $1.5 billion Caltrain Modernization Program and includes Positive Train Control technology.
Read More →
Combines transit, biking and walking in a single itinerary, customizes routes by travel mode and options such as quickest, flattest and most bike-friendly, and shows car-share locations.
Read More →