METRO Magazine Logo
MenuMENU
SearchSEARCH

Alstom, Transmashholding to create electric train

The train is designed according to the principles of basic platform and modular construction, which will allow rapid modification of rolling stock of different types and composition and adaptation of any future power supply.

June 6, 2011
2 min to read


Alstom Transport and its Russian partner Transmashholding (TMH) confirmed the design project for a jointly-created new electric train. The aim of this new product is to provide a reliable and economical solution for renewing Russia's regional and suburban fleets. The launch of a new regional train offering for Russia opens a new chapter in the cooperation between Alstom and TMH.

The train is designed according to the principles of basic platform and modular construction, which will allow rapid modification of rolling stock of different types and composition and adaptation of any future power supply.

Ad Loading...

The new electric trains will include four to 12 coaches (up to 1500 passengers) and will run at speeds of up to approximately 99 mph. It will operate according to the multiple unit system (i.e. two electric trains will, if necessary, operate synchronously in coupling) on both tracks with high and low platforms. They will be equipped with modern asynchronous traction drive and new bogies, providing a smooth run and reduced impact on the track. New trains will also be equipped with modern passive safety systems and a modular cabin.

These EMUs will ensure high level of passenger comfort and accessibility for wheelchair-bound passengers on high and low platforms. Several types of interior design are being created, providing comfort for both short and relatively long journeys. The trains will be equipped with the most up-to-date means of ventilation, heating, air conditioning and air purification, information displays and lamps with light-emitting diodes.

The first prototype is scheduled to go out of the factory at the end of 2012.

More Rail

Railby StaffFebruary 2, 2026

Chicago Region Transit Ridership Grows in 2025

The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.

Read More →
Managementby StaffJanuary 29, 2026

Valley Metro Sees Strong Ridership Growth in 2025

The agency ranked top five among mid-sized U.S. transit systems, defined as agencies with 15 million to 50 million annual trips.

Read More →
Busby StaffJanuary 29, 2026

Subway Customer Satisfaction Reaches Record High, New York MTA Says

The subway system saw increases across all key metrics, with 62% of subway riders reporting they feel satisfied with the system overall.

Read More →
Ad Loading...
Managementby StaffJanuary 27, 2026

Keolis Retains Virginia Railway Express Contract

The new contract for Keolis and VRE will commence in July 2026, with the potential to expand to 15 years.

Read More →
Busby StaffJanuary 27, 2026

California's OCTA Advances 2026 Initiatives Centered on Balance and Sustainability

The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.

Read More →
Railby Staff and News ReportsJanuary 26, 2026

People Movement: Virginia's DRPT Names New Director and More

In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.

Read More →
Ad Loading...
ManagementJanuary 23, 2026

Seattle Sound Transit Sets Launch Date for Crosslake Connection

This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.

Read More →
A blue and white graphic with a map of the proposed study area for the Sepulveda Transit Corridor and text reading "LA Metro Approves Underground Rail for Sepulveda Transit Corridor."
RailJanuary 23, 2026

LA Metro Approves Underground Rail for Sepulveda Transit Corridor

The agency’s selection aims to slash travel times from the San Fernando Valley to the Westside to under 20 minutes.

Read More →
TechnologyJanuary 21, 2026

Florida's Tri-Rail Taps Siemens Mobility for Modern Locomotive Procurement

Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.

Read More →
Ad Loading...
Rendering of an Austin Light Rail station.
RailJanuary 20, 2026

Austin Transit Partnership Advances Federal Funding Process for Light Rail Project

See how the agency’s transit project completed a Final Environmental Impact Statement within the federal two-year guideline.

Read More →