METRO Magazine Logo
MenuMENU
SearchSEARCH

FRA releases $50M for positive train control

Awards vary in size and scope ranging from $500,000 to $2M , and include private corporations, academic institutions and public authorities. Recipients include Southern California Regional Rail Authority, Amtrak and New York Metropolitan Transit Authority.

November 19, 2010
2 min to read


The  Federal Railroad Administration (FRA) awarded seven projects a total of $50 million to help deployment of positive train control (PTC) collision avoidance systems and other advanced technologies. The projects will receive money through the new Railroad Safety Technology Grant (RSTG) program.

 

Awards vary in size and scope ranging from $500,000 to $21 million, and include private corporations, academic institutions and public authorities.

Ad Loading...

 

“Safety is our highest priority,” said Transportation Secretary Ray LaHood. “This new program will help keep the rails safer by accelerating installation of positive train control technology where it is most needed.”

 

The FRA received 41grant applications requesting more than $228 million. Decisions on the competitively awarded grants were based on technical merit, including the extent to which a project helps achieve interoperability between technologies and the recipient’s project management capabilities and financial commitment to share costs.

 

Noting that all railroads will benefit from the work funded by the program, Federal Railroad Administrator Joseph C. Szabo said, “We are funding projects that confer the greatest benefits to the entire railroad community.”

 

FRA issued a Notice of Funding Availability on March 29, 2009 inviting applications from passenger and freight railroads, industry suppliers, and state and local governments. Notably, the program requires that selected projects be ready for deployment within 24 months of receiving a grant award and that grantees share 20 percent of the total cost. Recipients must also have received FRA approval of a Technology Implementation Plan and PTC Implementation Plan or successfully demonstrated that they could do so.

 

The RSTG program was authorized by the Rail Safety Improvement Act of 2008 (RSIA), which imposed a statutory deadline of Dec. 31, 2015 for PTC implementation on mainline tracks that carry passenger trains and certain hazardous material shipments. The selected projects are distinct and will help achieve resolution of technical challenges affecting all stakeholders.

Ad Loading...

 

Grant awardees for the Fiscal Year 2010 RSGT Program include:

  • Southern California Regional Rail Authority, $6,605,446:

  • National Passenger Rail Corp.- (Amtrak) Washington, D.C., $12,850,000;

  • New York Metropolitan Transit Authority/New Jersey Transit/Metro North Railroad, N.Y., $6,596,000;

  • Meterocomm Communications Corp.- Renton, Wash., $21,050,000;

Ad Loading...
  • Howard University-Washington, D.C., $857,106;

  • Railroad Research Foundation-Washington, D.C., $1,541,448.

 EXTRA: Read our story on positive train control from the August issue of METRO.

 

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →