For the past year, INDOT has been working to improve passenger rail between Indianapolis and Chicago on behalf of the state and communities with stops along the Hoosier State line. Recently, INDOT has been making progress in negotiating long-term agreements with two experienced passenger rail providers, Amtrak and Iowa Pacific.
The Indiana Department of Transportation (INDOT) and the Federal Railroad Administration (FRA) reached an understanding of the clear lines of accountability for passenger rail safety and accessibility between Indianapolis and Chicago, allowing Indiana to implement long-term improvements to the daily service.
INDOT Commissioner Karl Browning met in Indianapolis with FRA staff last week to discuss the roles and responsibilities for providing safe passenger rail service. Indiana's contracts would require Amtrak and Iowa Pacific Holdings, separately, to comply with all Amtrak and FRA requirements. In addition, INDOT would designate a staff member responsible for overseeing contract compliance.
Ad Loading...
"INDOT and the FRA share the guiding principles of access to safe mobility," Browning said. "Based on these guiding principles, we are both committed to a path toward continuing the Hoosier State service."
INDOT plans to continue existing Amtrak Hoosier State service in the near term until agreements can be finalized with Amtrak and Iowa Pacific. Amtrak, FRA, and U.S. Food and Drug Administration inspections of Iowa Pacific equipment are ongoing.
For the past year, INDOT has been working to improve passenger rail between Indianapolis and Chicago on behalf of the state and communities with stops along the Hoosier State line. Recently, INDOT has been making progress in negotiating long-term agreements with two experienced passenger rail providers, Amtrak and Iowa Pacific.
Under the proposed service, Amtrak would serve as the primary operator, working with host railroads, providing train and engine crews, and managing reservation and ticketing. Iowa Pacific would provide the train equipment, train maintenance, on-board services and marketing.
Amtrak will open grant applications March 23 for community projects near the Frederick Douglass Tunnel alignment in Baltimore as part of a $50 million investment tied to the B&P Tunnel Replacement Program.
The Denmark Station $2.3 million construction investment project includes a new 280-foot concrete boarding platform, built eight inches above the top of rail, for improved accessibility for passengers with disabilities and families with small children and much more.
Caltrain and its partners have implemented safety improvements at specific locations in response to known risk conditions, operational needs, and available funding since the agency’s founding.
On a recent episode of METROspectives, METRO Magazine’s Executive Editor Alex Roman sat down with Ana-Maria Tomlinson, Director of Strategic & Cross-Sector Programs at the CSA Group, to explore a bold initiative aimed at addressing those challenges: the development of a National Code for Transit and Passenger Rail Systems in Canada.
Competitive FTA grants will support accessibility upgrades, family-friendly improvements, and cost-efficient capital projects at some of the nation’s oldest and busiest transit hubs.
The 3.92-mile addition will soon take riders west beyond its current Wilshire and Western station in Koreatown, continuing under Wilshire Boulevard through neighborhoods and communities including Hancock Park, Windsor Square, the Fairfax District, and Carthay Circle into Beverly Hills.
Under the plan, all long-distance routes will transition to a universal single-level fleet, replacing today’s mix of bi-level and single-level equipment.