METRO Magazine Logo
MenuMENU
SearchSEARCH

Metra seeking RFPs for up to 42 new, remanufactured locomotives

Is asking for proposals for both new and remanufactured engines because it wants to weigh the costs/benefits of both options.

January 8, 2018
Metra seeking RFPs for up to 42 new, remanufactured locomotives

 

2 min to read


Chicago’s Metra issued a request for proposals (RFP) to begin to replace its aging fleet of engines with new or remanufactured locomotives.

The locomotive RFP calls for a base order of at least 12 new or 15 remanufactured locomotives, with options for up to 30 additional new locomotives or 27 additional remanufactured locomotives, for a total of up to 42 new or remanufactured locomotives. Metra is asking for proposals for both new and remanufactured engines because it wants to weigh the costs/benefits of both options.

Ad Loading...

Metra currently has about $125 million programmed for locomotive purchases over the next five years. The Metra board has asked staff to consider financing alternatives, such as leasing, to maximize the efficient use of available capital resources.

Metra’s 2014 modernization plan called for the purchase of 367 railcars and 52 locomotives. That 10-year plan, however, counted on Metra receiving $1.3 billion in new funding, most likely from a new state bond program. That anticipated new funding did not come through, and until and unless it does, Metra is attempting to acquire as many cars and engines as possible with existing funding.

That existing funding, unfortunately, falls far short of Metra’s needs. The RTA estimates Metra needs to spend $1.2 billion a year for 10 years to achieve and maintain a state of good repair on its system, including buying new cars and engines but also replacing and upgrading its bridges, stations, and other infrastructure. This year, Metra has one-sixth of that amount available.

“We are trying to do the best we can with available resources,” said Metra CEO/ Executive Director Jim Derwinski. “Clearly, however, we need more capital dollars to continue to invest in our system and upgrade our assets.”

Metra expects to award the contract for locomotives later in 2018, with delivery of the first locomotive in 2020. The new or remanufactured locomotives will allow Metra to begin to replace outdated diesel locomotives with modern, cleaner-burning engines, significantly improving air quality.

Ad Loading...

Metra issued an RFP for at least 25 new railcars in April 2017, and is currently evaluating responses, with a goal of approving a contract later this year. The scheduled delivery of the first cars will be part of the negotiations and dependent upon the manufacturer’s capacity to build. The last time Metra received new railcars for lines other than the Metra Electric was in 2006.

More Rail

A New York MTA subway car with an open gangway
Railby Staff and News ReportsSeptember 16, 2026

New York MTA Advances Final Contract for Second Avenue Subway Expansion

Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.

Read More →
A San Diego MTS Copper Line vehicle
Railby Staff and News ReportsSeptember 15, 2026

San Diego MTS Breaks Monthly Trolley Ridership Record

Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.

Read More →
NJ TRANSIT's new Multilevel III commuter railcar manufactured by Alstom
Railby Alex RomanSeptember 14, 2026

Report Examines NJ TRANSIT Reliability, Funding Challenges

The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.

Read More →
Ad Loading...
A CapMetro commuter rail train provided by Stadler
Railby Staff and News ReportsSeptember 11, 2026

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement

Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.

Read More →
Rendering of an Alstom train in a VIA Rail Station
Technologyby Alex RomanSeptember 10, 2026

Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More

In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.

Read More →
The CATS Gold Line in service with the city skyline in the background.
Railby Staff and News ReportsSeptember 3, 2026

CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips

With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.

Read More →
Ad Loading...
Designing Stations Around the Passenger
RailSeptember 2, 2026

Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations

Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.

Read More →
Amtrak Sunnyside Groundbreaking
Railby Staff and News ReportsSeptember 2, 2026

Amtrak Begins Major Construction at New York’s Sunnyside Yard

The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.

Read More →
O'Hare Flyer Rendering
Railby Staff and News ReportsAugust 27, 2026

Chicago Leaders Unveil Plans for O’Hare Airport Express Train

The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.

Read More →
Ad Loading...
An OCTA coastal rail line train.
Railby Staff and News ReportsAugust 27, 2026

OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor

The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.

Read More →