The Metropolitan Transportation Authority (MTA) and New York City Department of Transportation (DOT) teamed to install new wayfinding maps throughout the city, making it easier for subway customers to orient themselves and learn what a neighborhood has to offer as they step out of a subway station.
The next generation of the subway system’s helpful neighborhood map is being installed in all 468 subway stations.
Ad Loading...
Previously, the MTA had 68 different neighborhood maps in stations around the system. The same map was used in several stations and covered a radius between 15 and 30 blocks. At 46 x 59 inches, the new maps are identical in size to the old neighborhood maps, but with a coverage radius of about 12 blocks, they provide each station with a unique map centered on the station.
The new maps use the same base map as DOT’s WalkNYC wayfinding signage program, which provides detailed, location-specific maps and directional information to people navigating the city’s streets. However, they have been adapted to the subway with lighter base colors; subway lines and station footprints; and local, limited and Select Bus Service (SBS) routes.
So far, DOT has employed the maps on its pedestrian wayfinding signs, on Citi Bike kiosks and at prototype installations of the new SBS totems, which provide real-time bus arrival information at SBS stations using MTA’s BusTime data feed. With the addition of these new neighborhood maps in the subway, there will be a standard wayfinding map for pedestrians, transit riders and cyclists alike for the first time in New York City history.
The WalkNYC wayfinding system was designed for DOT and adapted for MTA’s use in the subway by PentaCityGroup, a joint venture between City ID, Pentagram, T-Kartor, Billings Jackson Design and RBA Group.
The region’s fixed-route system finished out the year with a total of 373.5 million rides. Adding 12.3 million rides over 2024 represents an increase that is equal to the annual transit ridership of Kansas City.
The priorities are outlined in the 2026 Board and CEO Initiatives and Action Plan, which serves as a roadmap to guide the agency’s work throughout the year and ensure continued progress and accountability on voter-approved transportation investments and essential mobility services.
In this edition, we cover recent appointments and announcements at HDR, MCTS, and more, showcasing the individuals helping to shape the future of transportation.
This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.
Expected to enter service in 2029, these locomotives support the agency’s commitment to offer reliable and efficient rail transportation across South Florida.