RELATED: NJ Transit equips 263 police officers with body cameras
NJ Transit continues to implement rail safety upgrades
Rail Operations is currently in the process of replacing all stub end tracks at Hoboken Terminal with new sliding friction bumper blocks, as well as advancing a speed control system for trains entering Hoboken Terminal.


NJ TRANSIT implemented a variety of rail safety upgrades over the past year and is looking at additional enhancements for the future, as part of its commitment to safety.
Rail Operations is currently in the process of replacing all stub end tracks at Hoboken Terminal with new sliding friction bumper blocks, as well as advancing a speed control system for trains entering Hoboken Terminal. Other initiatives this past year include enhanced sleep apnea screening and testing, adding additional personnel to the front of trains entering certain stations, and reducing speed limits.
“As we approach the one-year anniversary of the tragic incident at Hoboken Terminal, and while the cause has not been identified, NJ TRANSIT continues taking immediate actions to better protect our customers, our employees and the public,” said NJ TRANSIT Executive Director Steve Santoro. “The steps we’ve taken so far are moving us in the right direction and we continually raise the bar higher each and every day. Safety is a demand that I will not compromise or negotiate on.”
NJ TRANSIT hired an outside contractor to conduct a detailed inspection of all of the bumper blocks in Hoboken Terminal, and to provide a recommendation for the type of bumper block to replace the damage block on Track 5.
As a result, a decision was made to replace all of the bumper blocks with sliding friction bumper blocks at Hoboken Terminal, the Atlantic City Rail Terminal, and the Meadowlands Rail Station — all stub end stations.
In addition, NJ TRANSIT is also advancing the speed control system for trains approaching the end of the platform at Hoboken Terminal.
Over the course of the past year, NJ TRANSIT has implemented the following safety initiatives:
In October 2016, NJ TRANSIT implemented an interim measure where any safety sensitive rail employee who exhibits any indication of potential fatigue symptoms is immediately removed from service until they obtain the appropriate documentation attesting to the satisfactory results or the condition is not present. This initiative was formalized as policy in April 2017.
To date, 350 of 370 engineers and nearly a third of more than a thousand conductors have been screened for sleep apnea. By the end of September, all locomotive engineers will be screened for sleep apnea.
NJ TRANSIT has advanced the installation of forward and inward facing cameras on trains. To date, nearly 84% of trains now have forward facing cameras and more than 73% of the rail fleet has inward facing cameras, which are focused on the engineer’s actions. NJ TRANSIT expects to have both cameras in the entire fleet by year’s end.
Rail Operations implemented a new initiative which requires the conductor to ride in the front cab of trains, along with the engineer, when entering terminals in Hoboken, Penn Station New York, Atlantic City, Princeton, Gladstone, and the Meadowlands station.
Speed limits entering Hoboken, Atlantic City, Princeton and the Meadowlands Rail Station have been reduced from 10 mph to five mph as a proactive measure.
Rail Operations has increased the penalty for cell phone infractions, now up to a 90-day suspension for a first-time violation.
The Office of System Safety (OSS) continues to hire and backfill key safety positions including a deputy chief safety officer, industrial hygienist, environmental safety specialist, and safety education program specialist.
OSS conducted 16 safety blitzes at key grade crossings and stations to educate and reinforce rail safety to customers and the public.
This past year, the New Jersey Transit Police Department worked with a number of federal, state, and local law enforcement agencies and emergency responders, providing emergency response training for 750 first responders, and rail safety training for an additional 550 first responders.
More Rail

Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →
The Business Voice Behind Public Transportation
As chair of APTA’s Business Members Board of Governors, Ray Melleady explains how more than 850 business members are partnering with transit agencies to advance funding, innovation, and industry-wide collaboration.
Read More →
FRA Announces $5.3B in Rail Investments, Including $2B for Amtrak
Funding will support grade-crossing improvements, infrastructure upgrades, and new Amtrak equipment in 23 states.
Read More →
Finding the ‘Happy Medium’: Optimizing Maintenance Without Sacrificing Reliability
The key to maintenance optimization isn’t doing less work—it’s doing the right work at the right time on the right assets.
Read More →