Loading data...
The eight-foot-wide car has seating for up to 26 passengers with accessibility seating for passengers using wheelchairs and mobility devices and space for bikes.
Read More →There are now twin tunnels running 3.1 miles between downtown Seattle and the University of Washington. The contractor team, JCM U-Link Joint Venture, mined two tunnels about a mile long between the site of the future Capitol Hill Station and downtown Seattle. The project is about halfway complete and scheduled to open in 2016.
Read More →Revenues expected through 2023 are $3.9 billion, or 25 percent, lower than forecasted in 2008 when voters approved the ST2 expansion plan. The ST2 plan included flexible provisions for delivering the projects during economic downturns including reducing the scope or delaying projects.
Read More →Will provide its Interoperable Electronic Train Management System equipment and installation for 16 locomotives and 18 passenger transit cab cars as well as signal design and communications, mapping and systems integration.
Read More →The new agreement has clearer lines of authority, cost containment, operating rules, data reporting, and other language.
Read More →University Link will extend the region's first modern light rail system by about three miles and serve an estimated 70,000 additional daily riders in one of the most densely populated areas of the university and the nation.
Read More →The GoodMaps app, which uses light detection and ranging mapping technology to create highly accurate 3D maps of large public spaces’ interiors, will be added to the Northgate, University of Washington, Capitol Hill, Columbia City, and SeaTac/Airport stations.
Read More →The steep rise in real estate and construction costs in the region in combination with advancing environmental review and project designs have driven up cost estimates for future transit expansions, contributing to a $6.5 billion affordability gap for delivering projects on earlier schedules.
Read More →The accomplishment is made possible through an innovative agreement with Puget Sound Energy to purchase wind energy directly from the utility’s Green Direct program.
Read More →This final component of the 2 Line will cross Lake Washington and connect with the 1 Line at International District/Chinatown Station, creating a fully integrated regional light rail system.
Read More →