Loading data...
The Régiolis trains have been fitted with specific equipment such as passenger counting systems, dedicated storage space for bicycles and luggage, and front-panel displays showing the destinations.
Read More →Learn all about CBTC, the future of the New York City Subway. Installation of a new CBTC system allows NYC Transit to operate more trains per hour, thereby increasing passenger capacity; provide improved and more reliable service; and make more efficient use of its track and car fleet.
Read More →The DAS system gives trams drivers advanced warning of a potential impact with pedestrians, bikers, other vehicles, or objects obstructing the tram tracks.
Read More →The system already celebrated its millionth boarding passenger in May, ahead of projected ridership numbers. Since the launch of Sun Link streetcar, approximately 1.1 million passengers have enjoyed the ride.
Read More →These findings are part of the Chaddick Institute’s Technology in Travel study, which includes more than 35,000 unique passenger observations since 2009. Passengers are counted once on a given trip. Each year, passengers are observed by trained data collectors to determine how they spend their time while traveling.
Read More →Archer Western’s existing work with All Aboard Florida and the Orlando International Airport creates added efficiencies for the privately-funded passenger-rail project.
Read More →Every MI09 can transport up to 2,600 passengers at maximum speeds of approximately 75 miles per hour. Each train is made up of five cars, each equipped with three large doors on either side to facilitate passenger exchange in the stations.
Read More →The “Railroad Reform, Enhancement, and Efficiency Act,” which was unanimously approved by the Senate Commerce, Science and Transportation Committee, would authorize Amtrak for the next four years at an average $1.65 billion a year. Additionally, $570 million in total grant funding would be made available every year.
Read More →The new Altamont Corridor Express program leverages ETA Transit’s SPOT system and GovDelivery, an enterprise-class digital outreach platform engineered specifically for government, to help riders stay connected on train arrival and departure times or delays.
Read More →The legislation would authorize Amtrak for the next four years at an average $1.65 billion a year. Additionally, $570 million in total grant funding would be made available every year.
Read More →