Loading data...
The buses are equipped with BYD-designed and built iron-phosphate batteries, delivering 324 kWh of power that come with a 12-year warranty, the industry’s longest electric-battery warranty available.
Read More →Company to continue providing service for Foothill Transit; manage, operate Hot Springs, Ark. service.
Read More →In assessing its transition to sustainable mobility, LTD employed an innovative partnership with the University of Oregon to study opportunities and challenges.
Read More →Agency awards Coca Cola and Central Parking Systems new contracts, which will generate approximately $283,000 and $1 million respectively.
Read More →Designed to deliver faster, cleaner, and more reliable travel, Spark expands access to jobs, schools, and essential services while advancing the city’s vision for a sustainable, connected future.
Read More →The two contracts, valued at more than $30 million, include design, construction and equipping of the two stations as well as operating and fueling over a 10-year period.
Read More →The significant step toward sustainable transit comes after the bus underwent rigorous testing last year.
Read More →With the VEDS powering the bus, TriMet will be extensively evaluating system capabilities that can increase range up to 25% higher than other electric drive systems with similar sized battery packs in the North American market.
Read More →The agency has previously tested electric buses manufactured by BYD, Proterra and Complete Coach Works.
Read More →The total estimated cost for both contracts is $43.4 million. The contracts are for five-year terms, with an option for two additional years.
Read More →