Loading data...
The submission completes months of study and analysis, in cooperation with the FRA, DCTA's Swiss vehicle supplier Stadler and systems consultant LTK Engineering Services, to establish the equivalency of the Stadler vehicle design with traditional United States compliance standards.
Read More →DCTA purchased 11 diesel-electric GTW 2/6 articulated rail vehicles from Stadler. The vehicles offer level boarding and incorporate enhanced passenger information systems and video surveillance.
Read More →A-train project includes single-phase construction of 21 miles of regional rail, five rail stations, a bicycle/pedestrian trail, and a regional rail operating and maintenance facility.
Read More →Will manufacture two streetcars for the DC Streetcar system. The new vehicles will be built in the U.S. and will begin running in 2013.
Read More →If Metro were to stay in the building, it would need to expend an estimated $75 million to $90 million to replace almost every major building system (plumbing, heating and air conditioning, electrical, fire/life safety).
Read More →The activation puts 72.5% of the LIRR’s 305 total route miles now operating in PTC.
Read More →Prompted by pedestrian safety issues, the university chancellor would like the main campus to be closed to cars, with off-campus parking and a shuttle system.
Read More →In his current role in NYCT’s safety department, Patrick Lavin performs in-depth investigations into rail and bus accidents, including mainline rail incidents such as derailments and collisions.
Read More →The ten-year contract, awarded to OUTFRONT Media Inc., is valued at more than $336 million over the next decade.
Read More →In the last week, RT staff has worked closely with RT’s funding agencies and has identified a $1 million potential operating fund source.
Read More →