The addition of these 108 miles nearly doubles the route miles of the LIRR that are operating in PTC, to 220. LIRR
New York MTA’s Long Island Rail Road President Phil Eng announced the agency has activated Positive Train Control (PTC) on the eastern 108 miles of the railroad, from Patchogue to Montauk and from Ronkonkoma to Greenport.
Ad Loading...
The addition of these 108 miles nearly doubles the route miles of the LIRR that are operating in PTC, to 220. The activation puts 72.5% of the LIRR’s 305 total route miles now operating in PTC.
PTC uses a network of computers on board trains and along the tracks that are in communication with a central control hub, sharing data on rail conditions in real time. Like roads, every stretch of track has a speed limit; lights at the railroad’s equivalent of intersections flash red and green to indicate when a train must stop or can proceed. If the system detects that a train is operating too fast for a given stretch of track, or is at risk of passing a stop signal, the system automatically steps in to slow or stop the train, while alerting the train’s engineer that it is doing so.
PTC builds upon existing LIRR systems such as in-cab signaling and automatic civil speed enforcement. These safety measures already offer some of the most substantial functions of PTC to LIRR customers.
Today’s riders—and the communities you serve—expect more from public transit. While ADA compliance is required, leading transit agencies know that true accessibility also means delivering dignity, efficiency, and a better rider experience. This whitepaper reveals why forward thinking agencies nationwide choose the Low Floor Frontrunner as their first choice for ADA compliant vehicles—setting a new standard with passenger first design, faster boarding, improved safety, and unmatched operational performance.
Fred Ferguson, president and CEO of the American Bus Association (ABA), discussed how the industry prepares for emergencies, the growing recognition of motorcoaches as critical infrastructure, and steps operators can take to strengthen disaster readiness.
The approved contract modification will increase funding for transit security officer services to a total not-to-exceed amount of $32.1 million, ensuring a continued and visible security presence across DART’s buses, trains, stations, and facilities.
The Siemens CBTC System, Trainguard MT, in compliance with New York Subway Interoperability Interface Specifications, enables trains to run as close as 90 seconds apart, using next-generation signaling and continuous communication to keep operations moving seamlessly.
According to the new quarterly data, there were double-digit reductions in five of the eight serious crime categories, including aggravated assaults and robberies.
The project, finalized on February 12, provides the city with two different configurations of high-definition cameras to outfit 16 buses in the Pretzel City Area Transit fleet.
The funds will specifically reconstruct the portion of the pier used by PSTA’s Clearwater Ferry, creating a permanent dock for the ferry service, which serves as an important transportation and tourism link to other Pinellas County communities.