Loading data...
The $44.2 million contract also includes an option of 95 additional buses over five years, 16 plug-in charging systems, and four on-route chargers.
Read More →The vehicles are the first of approximately 500 electric buses that will be purchased as part of the historic 2020-2024 Capital Plan.
Read More →The new 2020SS mirror system for shuttle bus applications fits both GM G-Van and Ford E-Van chassis, in both 96-inch and 102-inch body widths.
Read More →ETS, Proterra, and ABB created a first-of-its-kind installation in North America using RFID technology, Wi-Fi, and two-step authentication that ensures each bus connects to its respective overhead charger.
Read More →The Worcester Regional Transit Authority estimates that replacing these three buses will eliminate 53 tons of harmful emissions and reduce petroleum consumption by more than 23,000 gallons per year, while reducing operating costs by more nearly $500,000.
Read More →The electric buses, to be delivered by March 2019, will be used on direct route 29 between the city center and Christchurch Airport.
Read More →The first five zero-emmision fully electric buses have been delivered and will begin operation in London through Metroline.
Read More →Four more vehicles, which feature two entrance doors and wider aisles, are scheduled for delivery in July 2006.
Read More →Agency was awarded a CMAQ grant in 2009-2010 to fund these and eight additional vehicles to be delivered in 2011. The vehicles cost just more than $400,000 each.
Read More →Meta Flor options include all smooth, or smooth/rib full width one-piece construction. The Meta Flor system is suited for all types of bus applications.
Read More →