Loading data...
A construction worker on the Second Avenue project who was stuck in mud up to his waist in a 75-foot-deep tunnel was freed in a four-hour rescue that involved more than 100 emergency workers. The worker, who was conscious, was taken to a hospital.
Read More →A Coradia iLint train covered 1,175 kilometers without refueling the hydrogen tank, only emitting water and operating with very low levels of noise.
Read More →The ARRA-funded Fox Chase train station building includes energy-efficient HVAC and lighting systems, and is eligible for a Leadership in Energy and Environmental Design Silver-designation.
Read More →Bringing the “In Motion” program to five Seattle-area neighborhoods this summer to help residents increase their use of travel options, such as walking, cycling, riding the bus or water taxi, and sharing rides. People who pledge to drive less can earn rewards, including free ride tickets for King County Metro and Sound Transit, and items, discounts, and gift cards donated by local businesses.
Read More →The $38.3 million project was completed in preparation for the expansion of Amtrak’s Downeaster line, which will begin serving Brunswick and Freeport, Maine this fall.
Read More →With this order, the MTA is taking up the second option on a contract originally awarded to Alstom and Kawasaki in 2002. Alstom’s share of the latest order represents approximately $491 million and covers the production of 242 metro cars.
Read More →In the last five months, images pulled from CTA surveillance cameras have assisted Chicago police in the arrest of at least 47 individuals for crimes committed either on or near CTA property.
Read More →In a letter, a state lawyer said the costs of testing the trains are rising and that they do not meet federal accessibility standards for the disabled. A spokesperson for Talgo Inc. denied both points and warned the cancellation could lead to legal action.
Read More →The $217,173,941 contract was awarded to Ground Transportation Systems Canada Inc. and includes installation, maintenance, and certain options for the CBTC system.
Read More →If Metra is unable to operate beyond December, it will work to ensure an orderly shutdown of its system and communicate with its customers with sufficient time for them to consider the effects of the shutdown, the resolution also states.
Read More →