Maine DOT unveils new Amtrak station platforms
The $38.3 million project was completed in preparation for the expansion of Amtrak’s Downeaster line, which will begin serving Brunswick and Freeport, Maine this fall.
The Maine Department of Transportation completed new train station platforms in Brunswick and Freeport, Maine, in preparation for the expansion of Amtrak’s Downeaster line, which will begin serving both cities this fall.
The Downeaster line expansion was funded by a $38.3 million grant from the American Recovery and Reinvestment Act (ARRA) through the Federal Railroad Administration’s (FRA) High-Speed Intercity Passenger Rail Program. Brunswick and Freeport have not seen passenger rail service since 1959.
The ripple effect of rail not only touches jobs associated directly with the project, but also jobs indirectly linked, including those associated with the people and products rail moves. According to the Northern New England Passenger Rail Authority, the work along the Downeaster corridor is creating business orders and sustaining and creating jobs at 53 companies in 20 states.
The ARRA grant was augmented by additional funds from the State of Maine to cover the project costs, including the construction of the Americans with Disabilities Act-compliant passenger platforms in Freeport and Brunswick. The Downeaster project will improve 36 highway-rail grade crossings, upgrade numerous wayside signals, install signals on the Brunswick Branch and result in many other right of way improvements.
To reduce congestion on the rail corridor and increase the reliability of the Downeaster service south of Maine, FRA has also provided the Northern New England Passenger Rail Authority with a $21 million grant to improve the Massachusetts Bay Transportation Authority-owned rail line used by the Downeaster.
This project includes new mainline track and installation of a section of double track to eliminate an existing bottleneck, which will provide a safer, faster, and more reliable travel experience for riders. Work is expected to begin in summer 2012.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →