CTA completes 'L' security camera installations
In the last five months, images pulled from CTA surveillance cameras have assisted Chicago police in the arrest of at least 47 individuals for crimes committed either on or near CTA property.
Mayor Rahm Emanuel, Chicago Transit Authority (CTA) President Forrest Claypool and Chicago Police Department (CPD) Superintendent Garry McCarthy announced that the project to install new state of the art security cameras at "L" rail station stops across the city has been completed six weeks ahead of schedule.
In all, nearly 1,800 additional cameras have been installed at 78 CTA rail stations during a fast-track initiative that was announced in June.
Mayor Emanuel, President Claypool and Superintendent McCarthy spoke at the Clinton Green/Pink Line station, where police recently used footage from newly installed station cameras to identify, arrest and charge an offender responsible for attacking and robbing a woman of her purse in an elevator a block away from the station. The same offender had previously appeared in surveillance footage using a stolen credit card, which connected him to a car burglary near CTA Headquarters two weeks earlier.
"The cameras have caught criminals but also serve as a deterrent, helping to ensure the highest level of security for our transit system," said Mayor Rahm Emanuel. "This is not just an investment in our rail system but in our neighborhoods. More security; more stations; more service: the CTA cameras are one part of our re-make of the CTA to modernize it and bring it into the 21st Century."
In the last five months, images pulled from CTA surveillance cameras have assisted Chicago police in the arrest of at least 47 individuals for crimes committed either on or near CTA property. Of these arrests, at least 23 offenders have been identified as participants in multi-offender attacks or crimes; at least 16 individuals have been identified for serial crimes committed on CTA property; and at least 10 individuals have been identified for crimes committed off CTA property.
More Rail

New York MTA Advances Final Contract for Second Avenue Subway Expansion
Contract Four is the largest in the Second Avenue Subway Phase 2 project and includes construction of station infrastructure, tracks, and signals for the subway expansion, MTA officials said. Work on Contract Four will begin in 2027.
Read More →
San Diego MTS Breaks Monthly Trolley Ridership Record
Agency officials said July’s ridership indicates MTS’s continued recovery from the pandemic.
Read More →
Report Examines NJ TRANSIT Reliability, Funding Challenges
The Garden State Initiative analysis examines the roles of Amtrak infrastructure, fleet management, and agency operations while recommending a more performance-based approach to improving reliability.
Read More →
Stadler, CapMetro Sign Long-Term Rail Fleet Support Agreement
Beginning in 2027, Stadler will provide on-site technical expertise, spare parts support, training, and obsolescence management to help extend the reliability and longevity of CapMetro’s GTW fleet.
Read More →
Biz Briefs: Alstom Lands Canadian Contract, LYT to Supply California TSP, and More
In METRO's latest installment, we take a look at recent news from Complete Coach Works, Beep, FlixBus, and more partnerships making headlines across the transportation sector.
Read More →
CATS Gold Line Marks 5 Years of Service, 2.8M Passenger Trips
With a six-mile expansion planned, the Charlotte streetcar is positioned to connect more neighborhoods and major transit hubs across the region.
Read More →
Why Simulating Pedestrian Movement Has Become Essential for Modern Rail Stations
Pedestrian microsimulation is helping rail planners identify bottlenecks, test station designs, and prepare complex transit hubs for growing passenger volumes.
Read More →
Amtrak Begins Major Construction at New York’s Sunnyside Yard
The new maintenance facility will support Amtrak’s Airo trainsets while improving maintenance efficiency and turnaround times in New York.
Read More →
Chicago Leaders Unveil Plans for O’Hare Airport Express Train
The privately developed project would offer a 15-minute trip between downtown and O’Hare’s Terminal 2, with trains operating every 15 minutes on a dedicated track. The service would use battery-electric trains and three existing freight rail rights-of-way.
Read More →
OCTA Maps Out 30-Year Strategy to Protect Coastal Rail Corridor
The draft feasibility report identifies strategies to protect the coastal rail line for decades as the agency continues near-term stabilization and sand placement efforts.
Read More →